Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Roof Instability Rating (RIR) System and Its Application at Enlow Fork Mine

    By John C. Stankus

    ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m

    Jan 1, 2001

  • SME-ICGCM
    Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)

    By Brian E. Travis

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall

    Jan 1, 1992

  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    Assessment Of Applicability Of Strength Criteria For Rock And Rock Mass To Coal Pillars

    The applicability of four empirical strength criteria for rock masses, namely, Hoek and Brown, Bieniawski - Yudhbir et al., Rarnamurthy - Arora and Johnston - Sheorey et al. has been tested against th

    Jan 1, 1992

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Failure Characteristics Of Roof Falls At An Underground Stone Mine In Southwestern Pennsylvania (75950903-1172-4003-a90c-706052b9d4ea)

    By Anthony T. Iannachione

    The location and time of 2,007 microseismic emissions from a limestone mine in southwestern Pennsylvania were compared with the development of mine faces and the characteristics of the mine layout. Ba

    Jan 1, 2001

  • SME-ICGCM
    Some Technical Considerations When Mining Under Bodies Of Water

    By John W. Fredland

    Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun

    Jan 1, 1982

  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    Stability of Backfilled Cross-panel Entries During Longwall Mining

    By Brad Seymour

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    The New Two-Dimension LaModel Program

    By Olayemi Akinkugbe

    As coal production in the United States continues to increase, the availability of unexploited or virgin fields continue to diminish. As a result, mine operators are forced to mine in unfavorable or m

    Jan 1, 2004

  • SME-ICGCM
    Assessment of the Dynamic Loads Effect on Underground Mines Supports

    By Kazem Oraee-Mirzamani

    Blasting operations generate seismic effects in underground mines. These effects apply additional dynamic loads on the support system, which should bear both static and dynamic loads. Static loads are

    Jan 1, 2011

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Study of load transfer capacity of bolts using short encapsulation push test

    By Naj Aziz

    A series of laboratory experiments were conducted on a variety of bolt types to examine the load transfer capacities of different profiled bolts in short encapsulation push testing. A 75 mm section of

    Jan 1, 2003

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Gateroad Support in the Czech and Polish Coal Mining Industry - Present State and Future Developments

    By Stanislaw Prusek

    The present state of Czech and Polish coal mining industry is presented at the beginning of the article. This paper will inform the reader of the general data concerning hard coal reserves? number of

    Jan 1, 2011

  • SME-ICGCM
    Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. China

    By Xianming Zhou

    Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl

    Jan 1, 1989