Influence Of Support Capacity And Geometry On Tailgate SupportBy E. Hosca
Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail
Jan 1, 1994
-
A New Rock Bolting Concept For Underground RoadwaysBy G. Skybey
The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi
Jan 1, 1992
-
Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt
Jan 1, 2001
-
Three-Dimensional Analysis Of Mine Dump Point StabilityBy Radoslaw L. Michalowski
The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li
Jan 1, 1990
-
Control Mechanism of a Tensioned Bolt System in the Laminated Roof with a Large Horizontal StressBy Song Guo
This paper will present the roof bolting finite element model developed at Jennmat Corporation used to study the control mechanism of the tensioned bolt system in the laminated roof with a large horiz
Jan 1, 1997
-
Design Considerations For Angle BoltersBy Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
New Approach to Evaluate the Stability of Yield PillarsBy Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months LaterBy Gift Makusha
Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u
Jan 1, 2004
-
Visual Recognition of the Load of Roof-Bolts by an IndicatorBy Joachim Leonhardt
Hundreds ofbolt-indicators were already used successfully in the German deep hard coal-mines to increase the safety and economy. The bolt-indicator offers the simple possibility to show roof-bolt (anc
Jan 1, 2001
-
Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel FloorBy Hideki Shimada
In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior
Jan 1, 2002
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining MethodsBy Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
Stereological Sampling And Analysis For Characterizing Discontinuous Rock MassesBy J. K. Owens
As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I
Jan 1, 1994
-
A Step Towards Understanding The Behaviour Of Wider Roadways In South African CollieriesBy George B. Quaye
Conventionally, roadways in South African collieries are 6 to 7 m wide. This dimension is chosen so as to allow maneuvrability of appropriate mine machinery and equipment, to meet production requireme
Jan 1, 2001
-
Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive EnvironmentsBy Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle
"The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv
Jan 1, 2016
-
Stooping Low Safety Factor Pillars At Goedehoop CollieryBy Gift Makusha
The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm
Jan 1, 2003
-
Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar DesignsBy N. P. Kripakov
The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to
Jan 1, 1994
-
Analysis And Field Testing Of Presupport Application In Coal StrataBy J. D. Dizon
Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat
Jan 1, 1990
-
An Investigation Of Longwall Pillar Stress HistoryBy M. G. Schuerger
The United States Steel Mining Company, Inc., (USM) Lynch District, operated the No. 37 Mine in the Harlan coal seam, Harlan County, Kentucky, from 19'2 until its sale to Arch of Kentucky in 1984
Jan 1, 1984
-
Pillarless Longwall Mining For Multiple SeamsBy Victor V. Nazimko
Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p
Jan 1, 1994
-
Mechanical Response of Split-Set Rock Bolts in Squeezing GroundResearchers from the National Institute for Occupational Safety and Health's Spokane Research Laboratory installed Split-Set rock bolts instrumented with strain gauges to document the mechanical
Jan 1, 2005