Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Progress In Implementing The Mineral And Petroleum Resources Development Act 28 Of 2002 (MPRDA) Provisions For The Employment Of Women In Mining ? Synopsis (cabbf7d2-17cb-416d-80b6-331f47f41a80)

    By C. Botha

    The South African democratically-elected government instituted policies and legislation that are intended to bring about change and transformation in the country and have drastically affected differen

    Jan 1, 2012

  • SAIMM
    Whole Plant Process Modelling Incorporating An Estimate On The Impact Of Uncertainties In Equipment And Orebody Composition On Separation Performance

    By R. M. G. Machunter

    The use of testwork to establish an economically feasible separating plant has been a long established practice in the mineral processing industry. However, uncertainties in orebody characteristics an

    Jan 1, 2007

  • SAIMM
    Ranking the efficiency of selected platinum mining methods using the analytic hierarchy process (AHP)

    By C. Musingwini

    The South African platinum mining industry is using a number of different mining methods, including variations of the same method, to extract the narrow reef tabular platinum deposits of the Bushveld

    Jan 1, 2008

  • SAIMM
    Development of flotation rate equations for Konkola primary mill cyclone overflow at various pulp densities and thickener underflow at 35% solids - Introduction

    By H. L. Zimba

    Flotation involves the selective levitation of mineral and its transfer from cell to launder. The flotation rate is the rate of this transfer. It may be defined by the slope of a recovery-time curve f

    Jan 1, 2009

  • SAIMM
    Integrated Short- And Medium-Term Underground Mine Production Scheduling ? Synopsis

    The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob

    Jan 1, 2012

  • SAIMM
    Possible Difficulties With Building Tailings Dams Of Cyclone Overflow Product

    By G. E. Blight

    Many mines engaged in deeplevel gold mining in South Africa are experimenting with the use of tailings fills, or are implementing tailings backfilling programmes on a limited scale. The approach varie

    Jan 1, 1988

  • SAIMM
    Analysis of Deep-level Mine Design Problems Using the MINSIM-D Boundary Element Program

    By J. A. L. Napier

    Computer programs which rely on the assumption of linear, elastic rockmass behaviour have been used routinely for many years in the South African mining industry to determine the stresses arising in t

    Jan 1, 1987

  • SAIMM
    Engineering Research And Development With Respect To J C I Backfill Operations

    By A. C. Wingrove

    The paper outlines the selection of a dewatered tailings backfill system for the Johannesburg Consolidated Investment Gold Division, and covers the following aspects: (i) 16 Shaft pilot testwork;

    Jan 1, 1988

  • SAIMM
    The Presence of Shear Stresses in Pillars and the Effect on Factor of Safety in a Room-and Pillar Layout

    By J. A. Maritz

    Since the dawn of mining, pillars have been used as primary support to ensure stable workings. Early designs were based on trial and error, after which more scientific means developed over time. A vas

    Jan 1, 2014

  • SAIMM
    A Follow-Up Paper On The Development Of The West Driefontein Tailings Backfill Project

    By M. F. G. Bruce

    Two backfill systems have been developed on West Driefontein, namely the centrifuge dewatered tailings system and the cyclone-classified tailings system. Modifications to the two systems since the p

    Jan 1, 1988

  • SAIMM
    Hollister Project - Introduction

    By Steve Konieczki

    [ ] Great Basin Gold Ltd. (GBG) owns the Hollister Mine and operates it through the wholly owned subsidiary Rodeo Creek Gold, Inc. The property is located in northern Nevada on the Carlin Trend gold

    Jan 1, 2008

  • SAIMM
    Investigating The Control Of Manganese Sulphide Precipitation

    By Y. -L. Chiang

    Paper written on project work carried out in partial fulfilment of BSc (Eng) (Chemical) The generation and control of manganese sulphide particle size distribution using various mixing configuratio

    Jan 1, 2007

  • SAIMM
    Campaign Mining Set-Up For Waste Stripping At New Vaal Colliery - Synopsis

    By P. R. Mothemela

    The objective of the investigation is to optimize the truck and shovel operations for pre-stripping at New Vaal Colliery by introducing campaign mining. The aim of campaign mining is to improve the ef

    Jan 1, 2013

  • SAIMM
    The Influence of Test Specimen Geometry on the Laboratory-Determined Class II Characteristics of Rocks

    By U. W. O. L Vogler

    "The behaviour of rocks depends on their material properties, and therefore it is important that these properties are determined by relevant and reliable laboratory testing methods. The ISRM Suggested

    Jan 1, 2016

  • SAIMM
    An Experimental Approach To Determine The Hole-Pressure Under Expansion Load ? Synopsis

    By M. Gholinejad

    Applying non-explosive expansion material (NEEM) is one of the safest methods for rock fracturing, especially in a hard rock quarry. An experimental study was conducted to determine the pressure exert

    Jan 1, 2012

  • SAIMM
    Advances In High-Temperature Heap Leaching Of Refractory Copper Sulphide Ores ? Synopsis

    Acid heap leaching has been extensively applied to the processing of copper oxide ores, with recovery of copper by solvent extraction and electrowinning. Heap leaching has also been extended to the tr

    Jan 1, 2012

  • SAIMM
    The Development Of A Metallurgical Flowsheet To Treat Tails

    By H. Jeram

    The ilmenite, rutile and zircon processes of the mineral separation plant generate tailing streams, which still contain valuable mineral. This is due to a combination of factors, which include separat

    Jan 1, 2007

  • SAIMM
    Mine To Metal: A Practical Balance For A Large Platinum Producer

    By H. E. Bartlett

    This paper deals with the sampling and mass measurement for ore delivered from a shaft to a processing plant and the contribution of the data from these measurements to the metal balances from shaft d

    Jan 1, 2014

  • SAIMM
    Incorporation of rehabilitation cost into the optimum cut-off grade determination - Synopsis

    By J. Gholamnejad

    Determination of the optimum cut-off grades is one of the most important aspects of mine production planning. A cut-off is a grade below which we choose not to process material. This material is treat

    Jan 1, 2009

  • SAIMM
    Quantification of uncertainties in geological modelling of kimberlite pipes

    By D. Farrow

    Future development of kimberlite mines is now focused on mining at deeper levels. The consequences are increased difficulty and costs of the mining operations. The decisions on investments require acc

    Jan 1, 2003