Prediction Of Slope Failure At Letlhakane Mine With The Geomos Slope Monitoring SystemBy George Kayesa
[ ] A multiple-bench slope failure occurred at Letlhakane mine on 14th July 2005. No injuries or damage to equipment was suffered and mining production was not affected. Slope failure was precede
Jan 1, 2006
-
Increasing Capacities By Retrofitting Mist EliminatorsBy S. A. Ziebold
There is often a need to increase capacity through existing mist eliminator installations without significant tower modifications. Often there is not enough extra space outside existing vessels unless
Jan 1, 2007
-
Estimating the Effects of Line Brattice Ventilation System Variables in an Empty Heading in Room and Pillar Mining Using CFDBy T. Feroze, B. Genc
"The ventilation of underground coal mines plays an important role in minimizing the risk of methane and coal dust explosions. The ability of ventilation, with the use of line brattices (LBs), to remo
Jan 1, 2016
-
The progression of metallurgical testwork during heap leach designThe depletion of favourably located and higher-grade mineral deposits, combined with more favourable metal prices and higher capital costs, has stimulated research into heap leaching of lower grade or
Jan 1, 2009
-
HPGR?revolution in platinum? - SynopsisBy C. M. Rule
High pressure grinding rolls (HPGR) technology has come a long way in its application for comminution duty in hard rock mineral processing in the last three years. Several major projects in copper, ni
Jan 1, 2009
-
The Lamella High Shear Rate REFLUX? ClassifierBy T. Orupold
This paper covers the commercial development of gravity separation of fine particles using a Lamella High Shear Rate REFLUX? Classifier (REFLUX? Classifier), focusing primarily on coal applications. T
Jan 1, 2014
-
Mine-wide panel stability monitoring at Anglo Platinum Union JV - SynopsisBy D. F. Malan
This paper describes the development and implementation of amine-wide continuous stability monitoring system at the Declines Section, Anglo Platinum Union JV. The Declines Section at Union JV experien
Jan 1, 2010
-
Preconcentration Of UG2 Platinum Ore: Economic Benefits - SynopsisBy F. Smit
Mining and plant practices can benefit from preconcentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed stre
Jan 1, 2013
-
Ilmenite Smelting At Ticor SABy D. Bessinger, H. Kotzé, J. Beukes
Keywords: Pyrometallurgy, furnace, ilmenite, smelting, Ticor Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and Minera
Jan 1, 2006
-
Unique Fall-of-Ground Prevention Strategy Implemented at Two Rivers Platinum MineBy A. Esterhuizen
Since 2005 Two Rivers Platinum Mine has set out on an initiative to actively monitor and control ground conditions on a daily basis, by making use of borehole cameras and pro-actively amending the sup
Jan 1, 2014
-
Integration Of A Waste Fill System Into A Longwall Gold MineBy A. S. Macfarlane
Western Deep Levels (North) is a deeplevel, longwall gold mine. Severe strata control problems and high rates of elastic closure, resulting in high rates of energy release, are associated with mining
Jan 1, 1988
-
Manning best practice in the Australian gold mining industryThis paper examines manning best practice in the Australian mining industry, comparing the mining of gold with mining of other commodities. In particular, the paper considers a range of mining operati
Jan 1, 2009
-
Anglo Platinum: Taking Advantage Of The Current Metal Prices And Shortage Of PlatinumBy G. Chunnett
Platinum metal prices have risen significantly during the past 18 months, and have remained at elevated levels. Driving these bullish prices are sustained jewellery demand, mainly from the Far Easter
Jan 1, 2006
-
The tapping process in silicon productionBy K. H. Berget, V. Andersen, H. Tveit, R. Jensen
This paper presents some of the work carried out in order to improve the tapping process in silicon production, with special focus on the environmental and the safety standards. Some of the modelling
Jan 1, 2014
-
The Loco Drill And Its Application To Flat End DevelopmentBy K. Moxham, B. McKeown
The South African gold and platinum deposits were formed in very different ways and yet both have many similarities. They are flat dipping tabular orebodies, extremely narrow and located in hard abras
Jan 1, 2006
-
A new approach to mine accident analysis: a case study of a mine cave-in - SynopsisBy D. E. Sweeney
In May of 1980, a mine operated by Belmoral Mines Ltd experienced a failed crown pillar, resulting in the death of eight miners and putting sixteen others in harm?s way. The Ferderber mine was located
Jan 1, 2007
-
Water requirements for the recovery of diamonds using grease technology - SynopsisBy J. Danoczi
South Africa is running out of fresh water and is looking at ways to improve water usage. This report addresses how a diamond mine in Gauteng has improved the utilization of its water resources. In t
Jan 1, 2008
-
Strategy Towards a Mining Industry-Wide Buyand- Maintain Quiet Initiative to Reduce Noise Induced Hearing LossBy H. Gumede
The challenges of noise emission in the mining industry are well known. These challenges are exacerbated by the increasing trend towards mechanized mining, and there is general consensus that an effec
Jan 1, 2014
-
Characterization Of Feti-Oxide Species Occuring In The Ranobe Heavy Mineral Deposit, MadagascarBy T. Wallmach
Heavy mineral deposits are a source of the economic important element titanium, which is contained in minerals such as ilmenite, pseudorutile and rutile. In the Ranobe heavy minerals deposit these min
Jan 1, 2007
-
Case Studies Of Slope Stability Radar Used In Open Cut MinesBy Keith Rowley, Neal Harries, David Noon
The management of risks associated with slope instability is an essential process in the safe and economic operation of open cut mines. The ?slope stability radar? (SSR) has been developed to better m