Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok Subsoil

    By Narong Thasnanipan

    This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w

    Jan 1, 2006

  • DFI
    Stub Pier Stabilization Performance

    By Swaminathan Srinivasan, Jess A. Schroeder

    "Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer

    Jan 1, 2017

  • DFI
    A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? Summary

    By Michael D. Justason

    This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola

    Jan 1, 1997

  • DFI
  • DFI
    Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial Till

    By Cassandra A. Wetzel

    Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

  • DFI
    Geo-Foundations Project Information Management Systems on a Budget

    By Jamey B. Rosen

    As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech

    Jan 1, 2019

  • DFI
    Steel And Concrete Piles Used In The Great Plains Of USA

    By Marius B. Wechsler

    A mathematical analysis is developed for the determination of the cases when HP-piles might be replaced by precast concrete piles. The analysis focuses especially on the "integral abutment-bridges" wh

    Jan 1, 1992

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • DFI
    New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2004

  • DFI
    LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test

    By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles

    "This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te

    Jan 1, 2017

  • DFI
    Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay Walls

    By Dimitris Pachakis

    In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th

    Jan 1, 2011

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • DFI
    Ultimate Pullout Capacity Of Batter Piles

    By M. R. Madhav

    The ultimate pullout capacity of single batter piles has been presented in literature in three contradictory trends. These trends are: the pullout capacity of a single batter pile increases, remain al

    Jan 1, 2010

  • DFI
    Drilled Shaft Design Optimization by Means of Static Load Testing

    By Riad Diab

    In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th

    May 1, 2022

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • DFI
    Harmonization of Execution Codes: Overview of Standardization for US Transportation

    By Silas C. Nichols

    "Abstract Piling and deep foundations are a staple for transportation projects in the United States (US). Driven or bored piles have been used for everything from support of bridge foundations and ret

    Jan 1, 2014

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    Ground Freezing: The Use of Liquid Nitrogen Systems Converted To Brine

    By Joseph A. Sopko

    There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th

    Jan 1, 2019

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Sleeved Pile Foundations For The W. Seattle - Harbor Islands Swing Bridge And The Seattle Access Projects

    By Kent C. Werle

    This brief discusses the installation and application of sleeved piles of two different types for two different projects, the W, Seattle to Harbor Island Swing Bridge Project and the Seattle Access Pr

    Jan 1, 1990