Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
 - 
                    
                The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)By Christian Besson
This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv
Jan 1, 2002
 - 
                    
                Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
 - 
                    
                Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009
 - 
                    
                State Of The Art In Double Rotary Drilling - Experience Gained From PracticeBy Markus Schönit
Double rotary drilling combines continuous flight auger drilling with a casing for producing a cast-in-place pile. When producing a pile an outer casing and an auger (hollow auger) rotating inside
Jan 1, 2011
 - 
                    
                
             - 
                    
                Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
 - 
                    
                The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation ConstructionBy Li Huimin
In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu
Jan 1, 1991
 - 
                    
                Anchored Pile Foundations In British ColumbiaBy Cory J. E. Yacyshyn
Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t
Jan 1, 2004
 - 
                    
                Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant StructureBy Tsunenobu Nozaki
"AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr
Jan 1, 2014
 - 
                    
                Embankment Piles ? IntroductionBy B. B. Broms
Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described
Jan 1, 2010
 - 
                    
                Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
 - 
                    
                Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil ConditionsBy Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006
 - 
                    
                Theoretical Examination of Initially Bent PilesBy Janne P. Isohaka, Anssi M. Laaksonen
"Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu
Jan 1, 2014
 - 
                    
                Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? SynopsisBy D. Goossens
Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the
Jan 1, 1996
 - 
                    
                Little Britain Project: Construction Of BasementBy R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
 - 
                    
                Recent Experiences With Bi-Directional Static Load TestingBy M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
 - 
                    
                Use of Porous Concrete in Secant Bored Pile WallsBy Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen
"Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to
Jan 1, 2017
 - 
                    
                Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2000
 - 
                    
                Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large DiameterBy Peng Jiahong
With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic
Jan 1, 1991