Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Ultimate Lateral Load of a Pile in Cohesive Soil under Static Loading

    By Dileej M. Dewaikar, Poonam A. Patil

    "In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met

    Jan 1, 2005

  • DFI
    Trump International Is OPA Winner

    "Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv

    Jan 1, 2009

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)

    By Craig H. Olson

    "Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t

    Jan 1, 2008

  • DFI
    The Underwater Cut-Off At The Walter F. George Dam

    By Gianfranco Di Cicco

    Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee

    Jan 1, 2013

  • DFI
    Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load Test

    By Scott M. Mackiewicz

    This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T

    Jan 1, 2008

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River

    By Craig H. Olson

    "A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at

    Jan 1, 2008

  • DFI
    Challenging Ground Conditons during Flooding Lead to Innovative Deep Foundation Design Process and Load Test Evaluation

    By Glen M. Bellew, James F. Mehnert

    "The Kansas City District-United States Army Corps of Engineers has completed the design modification of a pile supported floodwall located along the Missouri River in Kansas City, Kansas. This deep f

    Jan 1, 2016

  • DFI
    Tomographic Dst Algorithm For Stone Column Site Imaging And Characterization

    By Gerald Verbeek, Erick Baziw

    Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng

  • DFI
    Proposed Micropile Section for the 2006 IBC

    By Lawrence F. Johnsen, Marc J. Gallagher

    "Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap

    Jan 1, 2005

  • DFI
    DFI46 Panel on Foundation Reuse

    By Andy Boeckmann

    In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test

    Feb 1, 2022

  • DFI
    D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls

    4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article

    Jan 1, 1989

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • DFI
    Drilled Displacement Rigid Inclusions Support Port-Based Cement Facility

    By Morgan NeSmith

    The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the

    Apr 1, 2023

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach

    By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon

    "Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled

    Jan 1, 2005

  • DFI
    Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge Foundation

    By Aly M. Mohammad

    Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur

    Jan 1, 2007

  • DFI
    Intelligent Pile-Driving With A Diesel Impact Hammer

    By Michael D. Justason

    This paper describes the technology behind the development of an automated energy control system for a diesel pile hammer. Some background is given on experience using an energy monitoring system on

    Jan 1, 2006

  • DFI
    Secant Pile Walls - A Consistent Approach to Risk Management

    By Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling

    "Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn

    Jan 1, 2005

  • DFI
    Design And Analysis Of Cooling Tower Pile Foundations

    By Michael W. Oakland

    This paper summarizes the analysis and design of a pile foundation system for two 400 ft. diameter, 500 ft. high cooling tower using a detailed finite element analysis package. The cooling towers are

    Jan 1, 2010