Marine Foundation Retrofi t for the Richmond - San Rafael BridgeBy Patrick E. Durnal, Henrik Dahl
"A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the
Jan 1, 2007
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected ApplicationsBy Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
Drilled Pier Foundation In Hard Carbonate Rock ? SynopsisBy K. E. Darnell
Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type
Jan 1, 2010
-
Use Of The Impression Pile To Reduce Carbon EmissionsBy S. E. Stallibrass, A. M. McNamara, J. P. Panchal, Leonardo M. LaLicata
Urban development in congested cities requires a better exploitation of the available surface, leading to taller structures. These buildings are usually founded on piles that have to be increased in d
May 1, 2022
-
Studies On The Use Of Dcis Piles For Mitigating Liquefaction Of SoilsBy Viswanadham B. V. S., Babu K. V
Many refineries are in the process of revamping and expanding their existing facilities. Most of the refineries are located in coastal areas due to ease of transportation and storage of crude oil. Con
Sep 1, 2022
-
Pile Design Using Cpt Results: The “Lpc Method”By Frederic A. Verheyde
The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in
Nov 1, 2022
-
A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty GroundBy H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi
"In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe
Jan 1, 2015
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant FoundationBy Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Geo Data Integration for Offshore Wind Farm ProjectsBy Paul Doherty
The offshore wind sector is booming on a global scale, with the U.S. becoming a front runner in this highly progressive market. The Global Wind Energy Council has highlighted the exponential growth i
Oct 1, 2022
-
Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, PaBy Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv