Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken HillBy G C. Reed, J M. Murray
During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to
Jan 1, 2000
-
Optimisation of Wash Water on an Iron Ore Spiral to Improve GradeBy C M. Ramotsabi, F Bornman, W Erasmus
Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine
Jul 13, 2015
-
A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming ConditionsBy Y Li, Z Fu, D J. Williams, E Topal
Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface
Jul 27, 2015
-
The Application of Value Engineering Principles to Mining StudiesBy T Schrimpf, I Bryan
The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the
May 24, 2012
-
Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work ProgramBy T Bookless, J Pownell, D Meadows
The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more
Sep 26, 2013
-
Five years of cover performance monitoring and modelling for a store and release cover at Century MineBy T Rohde, P Defferrard
In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo
Jul 23, 2018
-
Admixture use in cemented rock fillBy B Roache, J O’Brien, M Gray
Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing
Nov 29, 2022
-
Cleaner circuit optimisation at Cadia OperationsBy J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters
The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs
Aug 29, 2018
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
Laboratory Flash Flotation Trends for a Variety of Gold ParticlesBy T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen
A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te
Sep 26, 2013
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold OresBy M G. Aylmore, L W. de Klerk
Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref
Sep 26, 2013
-
Renewed Exploration in Canada's Premier Iron Ore District - Labrador WestBy J OÆDriscoll, R Butler, L Winter
The iron ore mining district of Labrador West and adjacent Quebec is Canada's largest iron ore producer with almost 50 years of production. The area is currently experiencing a period of renewed
Jan 1, 2009
-
Post Closure Management of the Mt Leyshon Gold Mine - Water the IntegratorBy T Baumgartl, D Mulligan, R Haymont
Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the
Jan 1, 2006
-
Development of a Sustainability Roadmap for the Kwinana Industrial Area, Western AustraliaBy M John
The Kwinana Industrial Area (KIA) is by far the largest and most diverse industrial processing region (with supporting industries) in Western Australia. As with elsewhere in Australia (and globally),
Jan 1, 2009
-
Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan ExperienceIn February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct
Jan 1, 1998
-
Development and Testing of a Small-Scale Uranium Leach for Geometallurgical ApplicationsBy N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis
Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg
Sep 29, 2013
-
An Empirical Review of Extraction Bolting Design in Deep Ore Zone Mine PT Freeport IndonesiaBy F Sinaga, E Widijanto
PT Freeport IndonesiaÆs Deep Ore Zone (DOZ) mine is the new underground block caving mine within the East Ertsberg Skarn System (EESS) which started production in mid-2000. The DOZ will produce 25 000
Jan 1, 2002
-
Evaluation of a Two Lift Thick Seam Mining Method Based on Partial Extraction of 6m High Square Pillars with Relatively Small WidthBy Mikula PA
This paper presents the results of in-situ and laboratory investigations into a mining method which utilises conventional continuous mining techniques to carry out two passes in thick coal seams,
Jan 1, 1986
-
Off to a Good Start with Lift #2: Drawbell Extraction ù NorthparkesBy M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005