Search Documents

  • CIM
    Raising a Blind Shaft Between Two Submarine Coal Seams

    By Jos. Kalbhenn

    PART of the plan of re-allocation evolved by the engineers of the Dominion Steel and Coal Corporation in 1932 to retard the rapid advance of the submarine workings seawards was the opening of Dominion

    Jan 1, 1944

  • AIME
    The Manufacture and Characteristics of Wrought-Iron

    By C. EDWARD STAFFORD

    A Discussion of the paper by Mr. James P. Roe which was read at the Washington meeting, May, 1905. MR. C. EDWARD STAFFORD, Chester, Pa.:-During all my business life, I have been engaged in the manuf

    Sep 1, 1905

  • AUSIMM
    Strategic Decision-making in Mining – Business Optimisation Using Flexible Evaluation Models

    By B E. Hall, D B. Kahler

    "'Optimisation' has become a catchcry among many mining companies looking to tell the market how mining businesses will be improved and shareholder value increased. Consequently, the term 'optimisatio

    Mar 8, 2016

  • CIM
    Dotaku: an example of metallurgy in prehistoric Japan

    By K. T. Audt

    The Yayoi period, from about 300 B.C. to A.O. 300, represents a time of important changes in Japanese history. During this period the advanced rice culture of the Asian continent was introduced to Jap

    Jan 1, 1999

  • IIMP
    Prospección, exploración y desarrollo del yacimiento de Cuajone

    By Oscar Concha

    El presente texto describe la exploración, geología, controles estructurales, mineralización y los tipos de alteración hidrotermal del yacimiento minero Cuajone, situado al sur de la Cordillera Occide

    Apr 26, 1999

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • AUSIMM
    Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002

    The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must

    May 1, 2010

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957

  • NIOSH
    OFR-78(2)-80 Surface Mine Spoil Stability Evaluation Interior Coal Province - Volume II - Details Of Mine Visits & Detailed Procedures & Results Of Laboratory Testing (Appendix C)

    By Raymond P. Miller

    This two volume report addresses slope stability of surface mine spoils within the Interior Coal Province. Sixteen (16) mines were visited, pertinent data and samples collected, and reported spoil ins

    Jan 1, 1979

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • SME
    Origin Of The Problem: Rapporteur?s Report ? Introduction

    By Malcolm Ross

    The Reserve Mining Co., in the processing of taconite iron ore quarried from the Peter Mitchell Pit, deposited the finely crushed waste rock into Lake Superior near Silver Bay Minnesota. In the early

    Jan 1, 2007

  • SME
    Towards The Complete Double Parameterization Of Recovered Reserves In Open Pit Mining - Introduction

    By Kadri Dagdelen

    Design of the ultimate pit limit to direct long range mine planning has been a celebrated problem in the mining industry, and in mining academia, since 1965. Although many papers have been presented o

    Jan 1, 1982

  • SME
    The Brand-New Global Prevention Strategy of ISSA Mining for Safety and Health in Mining Safety 7.7 – 7 Golden Rules to Vision Zero

    By H. Ehnes

    "“Industry 4.0” – “Mining 4.0” - perhaps you have already heard of these terms? These keywords signify the next stage of industrial production. The internet and production technologies are growing clo

    Jan 1, 2016

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • AUSIMM
    Velvet underground exhumed – discovery and development of a new mining front at the Kanowna Belle gold mine

    By G Tripp, G Lorusso

    The Velvet gold orebody (153 Koz Au) is located near the Kanowna Belle gold deposit in the Boorara Domain of the Kalgoorlie Terrane, a subdivision of the Archaean Eastern Goldfields Superterrane (Swag

    Sep 20, 2017

  • AUSIMM
    Commissioning Under a Microscope ù The Cawse Nickel Start-Up

    By R Young, D OÆSullivan

    When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj

    Jan 1, 2001

  • NIOSH
    RI 3791 Geophysical Survey of Arkansas Bauxite Region Pulaski, Saline, Lonoke, White, Grant, Hot Spring and Clark Counties

    By J. R. Thoenen, J. L. Vallely, M. C. Malamphy

    "SUMMARYMagnetic and gravimetric surveys wore conducted over an area of ap¬proximately 1,400 square miles in the bauxite district of central Arkansas. The primary purpose of these surveys was to disco

    Feb 1, 1945

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • NIOSH
    IC 8309 Review Of Bureau Of Mines Coal Program, 1965 (691bde13-9114-41a4-bb5a-e36f4d515429)

    Advances were made during 19b5 in many phases of a broad program designed to increase efficiency in the mining, preparation, and utilization of coal. Also recorded were achievements in activities devo

    Jan 1, 1966

  • NIOSH
    IC 8309 Review Of Bureau Of Mines Coal Program, 1965

    Advances were made during 19b5 in many phases of a broad program designed to increase efficiency in the mining, preparation, and utilization of coal. Also recorded were achievements in activities devo

    Jan 1, 1966