Search Documents

  • NIOSH
    Minor Nonmetals ? Greensand (663043ea-a443-40cf-afec-69b5cd2ab503)

    By William F. Keyes

    Greensand, which is widely distributed in the Eastern United States, was produced in 1975 only by Inversand Co., a subsidiary of Hungerford & Terry, Inc., near Clayton, N.J. Production and sales infor

    Jan 1, 1977

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • SME
    Design of the Otjikoto Gold Mill, Namibia

    By John Rajala

    The Otjikoto Gold Mill was commissioned during November–December 2014 as Namibia’s first new gold producer in 30 years. Its operations consist of surface mining with a modern gravity/carbon-in-pulp mi

  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AIME
    Ventilating-System at the Comstock Mines. Nevada

    By George J. Young

    DR . JOHN A . CHURCH, in his treatise on the Comstock Locle 1 gave a full and clear account of the conditions of the mine during the period of greatest activity. The difficulties in the way of deep mi

    Nov 1, 1909

  • AUSIMM
    Continuous Vacuum Dezincing Plant at B.H.A.S. Pty Ltd., Port Pirie

    By Williams K. C

    This paper presents a brief account of the plant which has been developed at Port Pirie to recover, by vacuum distillation, the greater part of the zinc content of desilverized lead. The present plant

    Jan 1, 1956

  • AUSIMM
    Infrastructure Needs and Costs for Mining Projects

    By Gibbs R

    The objective of this paper is to provide a broad qualitative perspective of the needs and costs of infrastructure associated with typical mining projects. Infrastructure may be defined as anything

    Jan 1, 1990

  • AUSIMM
    Ore Grinding Energy Minimisation by Thermal Treatment

    By Dhar B. B, Gupta R. C

    Grinding of iron ore is an essential step to utilise ore fines for pelletisation needed for DRI units. While preparing iron ore pellets for DRI production, the iron ore needs extensive grinding whic

    Jan 1, 1999

  • SME
    Battery Park Truck Sewer Emergency Tunnel Project

    By Mark Rybak

    On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse

    Jan 1, 2008

  • AUSIMM
    Breakage Characteristics for Ores for Ball Mill Modelling

    By Whiten W. J

    An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode

    Jan 1, 1983

  • NIOSH
    Subject Index to Bureau of Mines Publications from July 1, 1990 to January 1, 1960 - Subject Index A-C

    "A bed, British Columbia, Canada, coal, carbonizingproperties B 510Pa., coal, washing characteristics RI 4941A' bed, Pa., coal, washing characteristics RI 4834"

    Jan 1, 1960

  • NIOSH
    Brass-Furnace Practice In The United States. - Introduction.

    By H. W. Gillett

    This bulletin is issued by the Bureau of Mines as a contribution to the increase of safety and efficiency in the preparation and utilization of the mineral resources in the United States. Notable amon

    Jan 1, 1916

  • DFI
    The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, London

    By J. A. Yeats

    This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to

    Jan 1, 1989

  • AUSIMM
    Improvements in the Application of Water Cooled Tests for Cupellation

    Since the introduction of water cooled test rings the operation of cupelling retort bullion has not alone been sImplified, but has also been the means of concentrating the bullion for the fining test

    Jan 1, 1901

  • NIOSH
    The Mineral Industry Of The Islands Of The Caribbean - Bahamas

    By Nicholas G. Theofilos

    The Bahamian economy weathered the worldwide recession of the last few years better than most developing countries. This was mainly owing to the ties between the tourist industry of the Bahamas and th

    Jan 1, 1980

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • AIME
    Cement and Concrete Are Not What They Used to Be

    By Raymond E. Davis

    LET'S imagine we are at the Grand L Coulee Dam, where daily 15,000 barrels of low-heat Portland cement and 27,000 tons of processed aggregate in various sizes are mixed to produce 30,000 tons of

    Jan 1, 1939

  • CIM
    The genesis of giants: lessons from the Tambogrande VMS district, Perú - (POWER POINT)

    By Lawrence Winter

    why are these deposits significant? (i) economically and (ii) in a VMS/geological context. ?Significance of the tectonic setting. ?New understanding of the regional geology: volcanic stratigraphy, f

    May 1, 2006

  • NIOSH
    IC 9307 Preval: Prefeasibility Software Program For Evaluating Mineral Properties

    By R. Craig Smith

    This report presents the software documentation for PREY AL, a prefeasibility mineral property evaluation program developed by the U.S. Bureau of Mines on a Lotus 1-2-3 spreadsheet. It is presented in

    Jan 1, 1992

  • AUSIMM
    Improvements in the Mercury Abatement and Process Efficiency of Adsorption, Desorption and Regeneration Gold Processing Operations

    By C Barton, B Randall, T Weldon, M Lefler

    FLSmidth-Summit Valley Technologies has been a leader in gold processing equipment for nearly two decades. Over the past several years an extensive research and development effort has led to improveme

    Jul 15, 2013