Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern PeruBy R Baumgartner
The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic
Sep 5, 2011
-
Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and FutureBy M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan
The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme
Sep 29, 2013
-
Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation DataBy F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz
A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical
Sep 29, 2013
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building a Stockpile Model for Modeling Gold Grade, Increasing Confidence and Reducing the Risk in Short Term Mine Planning at Akyem MineBy Benito Perez
Newmont Akyem mine in Ghana is committed with continuous improving results. A new environment where the price varies rapidly requires of better understanding of the deposits and the gold contained in
Sep 1, 2017
-
Building a Sustainability Strategy into a Consumer Products BusinessBy Leon H. Bruner
This paper presents a case study describing how a global consumer products company with 138,000 employees that markets over 300 brands in 180 countries is building sustainability into the rhythm of it
Jan 1, 2010
-
Building a University and Center For Energy in Sumatra, IndonesiaBy Tony Szwilski
Indonesia has enormous mineral resources. Its population of more than 180 million people inhabit most of the more than 13,000 islands. The country is becoming a significant economic power in Southeast
Jan 1, 1991
-
Building Aboriginal Relationships to Achieve Project SuccessPresentation Overview ?? Project Setting ? Project Context ? Challenges ?? Managing Commitments ?? Project Update ?? Maximizing Aboriginal Economic Participation in Resource Development P
May 1, 2004
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Building An Industrial Mineral Plant Outside The United States Or Canada - A Case Study In MexicoBy Joseph P. Nugent
The new combination gypsum plaster and gypsum wallboard plant of Compania Industrial Kaiser S.A., the first of its kind in Mexico went into production in April of 1969. This was approximately fourteen
Jan 1, 1969
-
Building An Intelligent Mining System – Morenci’s ApproachBy J. A. Flinn
Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y
Jan 1, 2000
-
Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic DamBy I Thin, L Morizzi, C Seymour, G Mungur
Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,
May 9, 2016
-
Building and executing an effective risk system for the mining industryBy Ewan Alexander
"As human beings, we have managed risk since the dawn of the ages and have been adept at doing so. In order to survive, we hunted or gathered. If we did not take enough risk, we died. If we took much
Oct 1, 2016
-
Building and Maintaining Effective Project TeamsBy J A. Wells, K G. Thomas, R F. Dewhirst
"One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.
Mar 8, 2016
-
Building and Structural Blasting in HungaryBy Sandor Nagy
The Explosive and Blasting Department of the Hungarian Mining Research Institute is responsible for the research and development of industrial applications of explosives. Appropriate explosives techno
Jan 1, 1977
-
Building AsiaÆs Latest Hard Rock MineBy T J. V Duffy, L H. D Siahaan, P G. Albert
G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard
Nov 20, 2012
-
Building better bow-ties – common pitfalls in risk analysisBy B Beale
Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective
Apr 16, 2024
-
Building Better Haul Roads: Designing For Structural StrengthThe structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo
Jan 1, 2011
-
Building Better Products Faster: The Case of Devinci's Instrumented BikeBy P. Maltais
Over the last 10 years, Computer Aided Design, Finite Elements Analysis and field testing of prototypes have enabled the cycling industry to grow and to significantly improve its products. However, to
Jan 1, 2006