Search Documents

  • CIM
    Coal Production by Contract Strip Mining

    By W. J. Blackstock

    Introduction To The great majority of people, the term 'strip coal' has little or no meaning, or if it has any significance it is thought to refer to a poor grade of coal that had to be a

    Jan 1, 1949

  • SME
    Coal Production Has Increased but the Future of Coal Remains Uncertain

    By William Gleason

    "Once the primary fuel source for the United States and the economic backbone for communities from Appalachia to Wyoming, coal has been on a steady decline since the mid 1990s, and is now at the cente

    Jan 9, 2017

  • SME
    Coal Production Scheduling Model

    By Rodrigo Jerez

    This paper describes a Mixed Integer Linear Programming model that was developed for planning the coal operations at Mountain Coals, Inc., in Kentucky. The model incorporates the use of stockpiles as

    Jan 1, 1984

  • AUSIMM
    Coal Production Scheduling Optimisation of Single Seam Open-Cast Mining

    By E Kozan

    The paper presents new developments of the methodology of open pit coal production scheduling optimisation. They deal with the specific features of the exploitation of single coal seam and utilisation

    Jan 1, 2003

  • SME
    Coal Prospect Evaluation Using High-Resolution Reflection Seismology - A Case Study

    By Robert J. Greaves

    High-resolution seismic reflection profiling can be used to evaluate detailed struc¬tural and stratigraphic features of coal pros¬pects. Since most coal prospects are relatively shallow (less than six

    Jan 1, 1983

  • SME
    Coal Quality and its Effect on Combustion

    By N. S. Harding, M. C. Mai, A. G. Fonseca

    Many coal characteristics affect combustion performance. Mill wear, boiler efficiency and derate, slagging, fouling, and ash collection and removal are only a few of the impacts of coal quality on boi

    Jan 1, 1988

  • SME
    Coal Quality And Resources In The Us Gulf Coastal Plain

    By J. C. Willett, J. R. Sanfilipo, P. D. Warwick

    The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen

    Jan 1, 2001

  • SME
    Coal Quality Challenges In The Powder River Basin

    By Sharon G. Roness

    Powder River Basin (PRB) mines were originally built to serve power plants designed specifically for their: coal. Sulfur was the major concern. Btu content and sodium limited the market for some plant

    Jan 1, 1998

  • SME
    Coal Quality Control An Analysis From Pit To Train

    By Foreback T. G.

    The McKinley Mine is a large strip operation sup-plying coal to several utility and industrial customers. The mine reserve comprises many coal seams of varying quality and thickness. Erosion of the te

    Jan 1, 1994

  • CIM
    Coal Quality Estimation using Geophysical Logging Without Radioactive Sources

    By Filipe Beretta

    This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t

    Oct 1, 2009

  • SME
    Coal Quality Impacts On Power Plant Operations With Gillette Area Coal

    By J. E. deMasi

    Over the past 12 years, Exxon Coal U.S.A., Inc. has shipped over 150 million tons of coal from two mines, Rawhide and Caballo, located in the Gillette, Wyoming, area. These mines are operated by The C

    Jan 1, 1989

  • CIM
    Coal rank changes in the Sydney and Pictou coalfields of Nova Scotia; cause and economic significance

    By Peter A. Hacquebard

    "The coals of the Sydney and Pictou coalfields are generally classed as high volatile ""A "" and medium volatile bituminous coals but there are significant differences within and even beyond this rank

    Jan 1, 1984

  • SME
    Coal Reclaim System Upgrade For Apache Generating Station

    By Gary G. Grim

    The reliable performance of the coal reclaim system is essential to the continued availability of a coal-fired electric generating unit. The control of fugitive coal dust within the areas housing the

    Jan 1, 1983

  • CIM
    Coal reclamation from the Summit Mine dump

    By Godfrey W. McDonald, Dennis E. Fredrickson

    "Commercial coal mining has been recorded in Nova Scotia since 1863 and during this period an estimated 60,000,000 short tons of mine discard containing 10 1030% coal has been accumulated, Approximate

    Jan 1, 1983

  • CIM
    Coal Reclamation from the Summit Mine Dump (Paper No. 13 )

    "Background:The recorded coal production in Nova Scotia from 1863 to 1980 was 390, 000, 000 short tons. This extraction was associated with an estimated 60,000,000 short tons of discarded material. Th

    Jan 1, 1983

  • ISEE
    Coal Recovery Improvement Using Stratablast™ at the Colowyo Coal Company

    By Gary Anderson, J. P. Remi Proulx

    Rio Tinto’s Colowyo Coal Mine produces 2.1 million tons per year in northwest Colorado. Colowyo uses the terrace mining method to recover up to seven coal seams ranging in thickness from 5 to 20 feet.

    Jan 1, 2012

  • SME
    Coal Recovery. From Refuse Ponds Employing Flotation Techniques

    By G. E. Wasson

    Coal in most refuse ponds including those owned by Consolidation Coal Company can be recovered by froth flotation techniques. Laboratory studies show that the flotation conditions required for coal re

    Jan 1, 1988

  • SME
    Coal Refuse Disposal In Mountainous Areas

    By Gordon Cook

    American Electric Power Company (AEP operates 31 coal mines in three states, and some 26 electric generating stations (19 coal-fired) located in the Ohio River Basin. Normally the system burns over 36

    Jan 1, 1983

  • SME
    Coal Refuse Disposal Practices In The Eastern United States And The Impact Of The OSM Regulations

    By Richard G. Almes

    Since the failure of a major coal refuse disposal embankment and impoundment in the Buffalo Creek watershed near Man, West Virginia in early 1972, there have been extensive changes in the design and c

    Jan 1, 1980

  • SME
    Coal Refuse Utilization As Concrete Aggregate

    By C. Patrick

    Annually, the U.S. coal industry generates and must dispose of over 200 million tons of coal refuse, expanding a major environmental problem. The purpose of this research was to investigate the feasib

    Jan 1, 1995