Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical Methods
By Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the Netherlands
By Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
-
Uncertainties In CSL Test Interpretations And Recommendations Toward A More Efficient Process
By Rohrbach
Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, secan
-
Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)
By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin
"Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca
Jan 1, 2017
-
Long Term Performance of Grouts and the Effects of Grout By-Products
By Stephan A. Jefferis
I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the
Feb 10, 2003
-
New Findings on the Capacity of Connections between Micropiles and Existing Footings
By João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez
"Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou
Jan 1, 2015
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall
By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress Level
By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult
Jan 1, 2017
-
Jet Grouting for Strength in Marine Sediments with Hydrocarbons
By Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Liquefaction Susceptibility Evaluation using Site-Specific Seismic Demands in the San Jose Area
By Martin Walker, Joseph Ang, Jongwon Lee, Alvin Bayudanto, Lilian Lorincz, Morteza Khorshidi, Wenyong Rong
This paper presents a case history of liquefaction susceptibility evaluation study for a major infrastructure project in the San José area. The subsurface material of the study area consists of Holoce
Sep 8, 2021
-
Innovative Crosshole Sonic Logging Testing Drilled Shafts
By Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation
By James R. Gingery, Byron Foster, Bret Lingwall
While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th
Sep 8, 2021
-
Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)
By Donald T. Robertson, Kurt Hecht, Michael K. Muchard
"This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during
Jan 1, 2017
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi
By F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Load Distribution for Underpinning System Using Inherent Rigidity of Concrete Dam
By Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker
The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier
Sep 8, 2021
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, California
By Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method
By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Wadi Dayqah Dam Curtain
By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen
"The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the
Jan 1, 2016