Experience-Based Value Engineering of Foundations & Deep Excavation Support Systems
By Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte
Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects
Sep 8, 2021
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground Station
By Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii
By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods
By Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Army Corps Mega Projects Benefits From Innovative Foundations
By Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Carbon Footprint Of Common Quay Structures
By Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb
With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a
May 1, 2022
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions
By Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep Terrain
By Scott D. Neely, Donald R. Clark
"An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g
Jan 1, 2015
-
Seepage Barrier Mix Design Development, Installation, and Evaluation
By George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure
By Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
East Boston Branch Sewer Relief Project: Support Of Excavation Case Study
By Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)
By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As Aggregates
By Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
Prescriptive Specification Design: The Impact on Cost and Constructability – Case History
By Shawna Munn, Nadir Ansari, Allison Bennett
"This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an
Jan 1, 2017
-
Strain Gauge Interpretation Using Automated Collection Systems and the Accuracy of Using Extrapolated Modulus vs Constant Modulus of a Pile, Along With the Importance of a Detailed QA/QC Program
By Michael A. McNicholas
"Deep foundations utilize the varying soil conditions to provide the most cost-effective or practical scope for a given jobsite. Once the scope has been determined and the engineering applied, the ele
Jan 1, 2017
-
Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion
By Steven R. Ahlfield, Ali Ghandeharioon
A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during
Jan 1, 2019
-
Liner Piles Used As Support To Kentledge For Initial Compression Load Test
By Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Overview Of The Federal Highway Administration's (FHWA) Deep Foundations Research ? Introduction
By John L. Walkinshaw
It is obviously not possible in the time given me today to review in great detail all the research of the past 20 years that the (FHWA) has sponsored or participated in. In this presentation I wil
Jan 1, 1993
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles
By Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.
By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900