Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • DFI
    Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study

    By David A. Staab

    Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog

    Jan 1, 2004

  • DFI
    Load Test Analysis On Augered Pressure Grouted Displacement Piles

    By Wei Zheng

    A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under

    Jan 1, 2007

  • DFI
    San Francisco International Airport Air Traffic Control Tower Pile Foundations

    By Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz

    "The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to

    Jan 1, 2017

  • DFI
    Forensic Evaluation Of Bored Piles For A Factory Project At Jhajjar

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram

    A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo

    Sep 1, 2022

  • DFI
    Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts

    By Cheng Lin

    The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a

    Jan 1, 2009

  • DFI
    Soil-Structure Interaction For A Tension Pile Pulled With Strand

    By Chandramohan P. V

    A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve

    Nov 1, 2022

  • DFI
    Atoka Pipeline - Canadian River Crossing

    By Jewels Stover, Charles A. Luxford

    Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv

    Sep 8, 2021

  • DFI
    Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan

    Jan 1, 1989

  • DFI
    The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large Warehouses

    By Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse

    "Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)

    Jan 1, 2017

  • DFI
    Rapid Vibratory Pile Driving Hammer For Deep Foundation

    By Li Tiemin

    It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera

    Jan 1, 1991

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Monitoring Auger Cast In Place Pile Construction And Testing In Hard Clay

    By C. Vipulanandan

    Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • DFI
    DFI Europe Monitoring and Instrumentation Committee Objectives

    By Rob van Dorp

    "AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta

    Jan 1, 2014

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019