1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers
By J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
Automated Installation Monitoring For Augercast And Driven Piles
By Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
The Deep Cut-Off at the Walter F. George Dam
"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Damage To Initially Bent Piles ? Synopsis
By B. B. Broms
A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of
Jan 1, 2010
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests
By Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam
By Eric M. Klein
As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad
Jan 1, 2006
-
Piling Problems - Introduction
By D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
Effect of Non-Plastic Fines on Liquefaction Susceptibility of Fine Sands
By Kodi Ranga Swamy, N. Sankar, M. Akhila
"Until recently, liquefaction-related studies concentrated on clean sands believing that only sands are susceptible to liquefaction. However, a few earthquakes like 1976 Tangshan earthquake, the 1989
Jan 1, 2017
-
Lateral Performance Of Two-Section Helical Piles In Soft Soils
By Mohammed Sakr
A Two-Section Helical Pile (TSHP) is a steel pipe with two shaft sections of different diameters and with one or more helix plates near the bottom of each shaft section. TSHPs are used regularly in we
Jan 1, 2009
-
The Pile Foundation Of Tall Buildings In Shenzhen
By Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts
By Harry Schnabel
A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi
Jan 1, 2011
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.
By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation Support
By John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
Capitol Complex Phase 1 Expansion
By Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
-
High Capacity And Fully Removable Soil Anchors
By Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Secant Pile Walls - Design, Construction And Case History
By Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:
By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project
By Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
Modern Procedures For The Design Of Driven Pile Foundations
By G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988