Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • DFI
    Analysis of Panel and Pile Verticality and Overlap in a Project Information Management System

    By Jamey Rosen, Georgette Hlepas

    Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa

    Sep 8, 2021

  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
    Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)

    By K. Rainer Massarsch

    "Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an

    Jan 1, 2004

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2013

  • DFI
    CFA Pile Design Parameters in Sand

    By Stuart Coutts

    "This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc

    Jan 1, 1900

  • DFI
    Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study

    By Carl-Oscar Nilsson, Åke B. Nilsson

    "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the

    Jan 1, 2016

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History

    By Raffaella Granata, Daniele Vanni

    "This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o

    Jan 1, 2016

  • DFI
    Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International Standards

    By Sowmiyaa. V. S., Tiruvengala Padma

    Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa

    Sep 1, 2022

  • DFI
    Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft Foundation

    By P. Seethalakshmi, Yatakuri Yaswanth Naidu

    The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye

    Sep 1, 2022

  • DFI
    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    From Linear To Circular Economy; Using Hollow Piles To Reduce Embodied Carbon And Promote Pile Reuse

    By Andrew McNamara, Stuart Norman, Matthew Dearing, Michael Pelken, Asha Panchal

    The deep foundations industry has largely remained unchanged since in the advent of CFA piling in the 1960s. Piles have consequently been designed and constructed following the traditional codes and s

    May 1, 2022

  • DFI
    Deep Compaction Using Vibratory Pile Hammers

    By Dennis Nottingham

    The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer

    Jan 1, 2013

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • DFI
    Recent Advantages of CDM-LODIC Method (Low Displacement and Control Method)

    By Yuji Yamashita, Kazuyoshi Kamimura, Tsuyoshi Takahashi, Naoya Matayoshi

    "The CDM-LODIC method (cement deep mixing - low displacement and control) method enables ground displacement to be reduced by removing an amount of soil equivalent to that of injected cement slurry an

    Jan 1, 2015

  • DFI
    Piled Rafts: Are We Modelling Them Correctly?

    By Jonathan J. Dewsbury

    It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e

    Jan 1, 2010

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017