Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Downdrag Effects on the Pile Groups Supporting Bridge Abutments
By M. Hesham El Naggar, Tony Sangiuliano, Alper Turan
"Bridge abutments supported on pile foundations are often constructed over weak and compressible soils. The consolidation settlements induced by the embankment loads are known to result in downdrag an
Jan 1, 2015
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.
By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology
By Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine
By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Soft Deep Mixing for the Mitigation of Seismic Risk
By A. Flora, E. Bilotta, F. Foria, V. Nappa
"All the typical applications of deep mixing rely on the good mechanical properties of the improved columns to strengthen or stiffen the ground for a number of geotechnical applications.This paper foc
Jan 1, 2015
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast Piles
By F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts
By Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Deep Foundation Element Supported Mat Design And Construction In An Urban Setting
By Satyajit A. Vaidya
This paper presents a case-study in the design and construction of deep foundation element supported mats for two residential towers on an18,000-square-foot site in Brooklyn, New York. Based on site
Jan 1, 2010
-
A Study On Performance Of Piles Based On Methods Of Installation
By Babu K. V., Samyukta P.
The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac
Sep 1, 2022
-
Anchored Diaphragm Wall and Dewatering System for Libya Hotel
By Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya Hotel
By Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
CPT Methods for Helical Pile Design
By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
Soil Fatigue Analysis for Pile Driving Simulations Using an Impact Hammer
By Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer
"For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h
Jan 1, 2017
-
A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place Project
By Stuart Hardy, Xiangbo Qiu
The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original
May 1, 2022
-
Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining Walls
By Pawan L. Sethi
Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal
Nov 1, 2022
-
Construction Of A Spillwall In The Columbia River
By Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Innovative Use Of Ground Improvement
By Mark Koelling
This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord
Jan 1, 2010
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis
By D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ Inclusion
By Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu
"In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,
Jan 1, 2015
-
No. 1 Queens Road - Melbourne, Australia
By Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005