Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geochemical exploration in areas of shallow till: some case histories

    By A. D. Thomas, V. N. Rampton, S. Paradis, C. F. Gleeson

    "A shallow till sampling program was completed on a 1 km grid over the St . George Batholith in southern New Brunswick. The ""B"" soil horizon was analyzed for Cu, Pb, Zn, Ag, Co, Mo, U and Sb and the

    Jan 1, 1986

  • CIM
    Tuluwaka Mine – From Greenfield to Production in 14 Months

    By Ross Nairn

    "Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani

    Jan 1, 2006

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • CIM
    Moly Upgrading Profiles with Flotation Columns

    By R. Amelunxen

    "The molybdenite associated with copper porphyry ores is generally treated in a flotation circuit consisting of a separation and a cleaning section. In the last few years column flotation cells have r

    Jan 1, 1990

  • CIM
    Canada's coal resources and reserves: an overview

    By H. G. Rushton, A. S. Romaniuk

    "The opening chapter of this volume, by A. Ignatieff, places in perspective Canada's coal resource base as part of the world scene. This chapter will focus on the Canadian scene.Units of measurement i

    Jan 1, 1985

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    Dispersion study on slimes from Niobec

    By J. A. Finch, A. R. Laplante, R. Espinosa-Gomez

    "The Niobec concentrator rejects up to /5% of the Nb as slimes (-10u.m). The recovery of Nb from these slimes by column flotation is being studied. An essential condition for selective flotation is sl

    Jan 1, 1987

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    Numerical Modeling of Aluminum Extrusion Processes for Complex Hollow Pro-Files based on a Spatial Flow Formulation

    By N. Manopulo, J. Maier, L. Tong, C. Becker, P. Hora

    The contribution presents a new finite element approach in which the common updated Lagrangian formulation is replaced by a spatial flow formulation applying a special arbitrary Lagrangian-Eulerian fo

    Jan 1, 2015

  • CIM
    Flexibility of the Outokumpu Flash Smelting for Low and High Grade Concentrates - Evaluation By CFD-Modeling

    By K. Eklund, T. Ahokainen

    The Flash Smelting process is the most used production method for primary copper in the world. The basic idea of the Flash Smelting is to utilize the thermal value of sulfidic concentrates and melt th

    Jan 1, 2007

  • CIM
    Barrick Goldstrike Roaster - Roasting and Gas Handling

    By Andy Cole, Ken Thomas, Stephen Durn, Jacques McMullen

    "The roasting and gas handling circuits of the Barrick Gold’s new Roasting Facility at the Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the desig

    Jan 1, 2001

  • CIM
    The Pronto Mine

    By James A. Robertson

    "The Pronto Mine located at the east end of Lake Lauzon, Long Township, some 12 miles east of Blind River is of historic note being the discovery locality and the first producing mine of the Elliot La

    Jan 1, 1986

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    The Abatement of Acid Mine Drainage in Ontario

    By John R. Hawley

    "This paper is intended as a review of the progress that has been made in the Province of Ontario in the field of acid drainage waste treatment technology.Three years ago, at the Third Annual Meeting

    Jan 1, 1974

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988