Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Influence of Welding Parameters on Stir Zone Microstructures during Friction Stir Welding of Magnesium Alloys

    By S. Borle

    The microstructural features produced in friction stir welded AZ31, AZ80 and AZ91 alloys are examined when different welding parameters are applied. The microstructures primarily consist of a-Mg grain

    Jan 1, 2011

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls

    By T. Yeomans

    NVI Mining’s Myra Falls operation is a forty-year-old underground mining operation feeding a 4,000 metric tonnes per day concentrator. The current mill, built in 1985, was designed to process a massiv

    Jan 1, 2009

  • CIM
    Phoenix Copper Leach - Cathode Eight Years in the Making

    By A. R. House, G. W. Shepherd

    Newmont USA Limited owns and operates the Phoenix Mine near Battle Mountain, Nevada, USA. The existing milling facility has operated since 2006 (House, 2010). Following the startup of the milling oper

    Jan 1, 2014

  • CIM
    Properties of Asbestos Fibers Imported into the United States

    By M. S. Badollet, N. W. Edgerton

    "A study of the physical properties of long grades of asbestos fibers imported into the United States during the past eight years has disclosed information that will contribute materially to effective

    Jan 1, 1960

  • CIM
    Lead-Zinc Smelting - 40 Years of Pollution Control

    By G. R. McMeekin

    "THE TOPIC suggested for my contribution to this Symposium was ""Lead-Zinc Smelting - 40 Years of Pollution Control"". The history of the development of smelting industry at Trail and the control of s

    Jan 1, 1972

  • CIM
    Giant's Milling Operation

    By H. E. Pawson

    Giant Yellowknife is located 600 air miles north of Edmonton on the north shore of Great Slave Lake in the Northwest Territories. In its 24 years of operation some 7,730,000 tons of ore have been trea

    Jan 1, 1973

  • CIM
    Oxidation, Weight Gain and Self-Heating of Sulphides

    By J. E. Nesset, J. A. Finch, Rosenblum. F., S. Somot

    "In a previous presentation at the CMP, evidence was shown for the formation of hydrogen sulphide (H2S) in self-heating experiments on pyrrhotite-rich samples (Somot and Finch, 2006). Oxidation of H2S

    Jan 1, 2009

  • CIM
    The Wellington Lake Power Project

    By E. M. Stiles

    THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that

    Jan 1, 1940

  • CIM
    Integrated seismic reflection and borehole geophysical studies at Les Mines Selbaie, Quebec

    By E. Adam, B. Milkereit, M. Salisbury, L. E. Reed, G. Perron

    Integrating seismic reflection, borehole geophysical, and physical rock property studies is an effective means of mapping lithological contacts and structures in the crystalline crust. At Les Mines Se

    Jan 1, 1997

  • CIM
    Application of Process Integration Based Models to Optimise Energy Consumption in Integrated Steelworks

    By Habib Zughbi, Paul Zulli

    "A key step towards sustainability in iron and steelmaking is to optimise the use of raw materials and energy consumption, and consequently minimise CO2 emissions. Models based on a Process Integratio

    Jan 1, 2015

  • CIM
    Retrofit of Agrium’s Special Standard Surge Bin Improves Reliability, Safety, and Life Cycle Cost

    By T. Holmes, S. Davison

    "A surge bin at Agrium’s Vanscoy potash operations has been plagued with flow, wear, and corrosion issues since being built in 1967. The culprits? The bin’s carbon-steel construction, geometry, and th

    Jan 1, 2018

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options (CIM Journal | Vol. 4, No. 4)

    By D. Van Tonder, C. Edwards

    ABSTRACT Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium-bearing solution prior to final product precipitation. A number of strip options are available

    Jan 1, 2013

  • CIM
    Mining Innovations at McArthur River Operation

    McArthur River Operation is the world?s largest high grade uranium deposit and is located in Northern Saskatchewan. McArthur River came into production in December 1999 with a number of innovative tec

    May 1, 2011

  • CIM
    Advanced Ni-Base Superalloys for Small Gas Turbines

    By K. Harris, J. B. Wahl

    Ni-base superalloy cast materials provide an outstanding balance of high temperature strength, fatigue resistance, oxidation resistance and coating performance and can be produced to very tight tolera

    Jan 1, 2010

  • CIM
    Exploration significance of the emplacement and genesis of massive sulphides in the Main Zone at the Norita Mine, Matagami, Quebec

    By W. H. MacLean, P. J. MacGeehan, A. J. Bonenfant

    "The Norita deposit is an Archean volcanogenic-exhalative Fe-Zn- Cu sulphide accumulation of the distal type, consisting of six overlapping stratiform massive sulphide lenses, interbedded with exhalat

    Jan 1, 1981

  • CIM
    Chemcell Petrochemical Operations at Edmonton

    By J. A. Relf

    The construction of refineries and gas conservation plants in the general Edmonton area in the early 1950's made available large quantities of by-product liquified petroleum gases (LPG). These gases,

    Jan 1, 1962

  • CIM
    A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, Nunavut

    By K. Muehlenbachs, J. U. Stemler

    "Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary

    Jan 1, 2006

  • CIM
    Mine Engineering at Gaspe Copper

    By J. B. Watts

    "THE Mine Engineering Department at Gaspe Copper is staffed by a chief engineer, assist-ant engineer, research engineer, chief surveyor, four instrument men, chief bonus clerk, draftsman, and a helper

    Jan 1, 1959

  • CIM
    The Development of a Novel Zinc Collector Using Both Lab and Mil Scale Trials

    By D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel

    "The steps from experimental curiosity through to commercial product can be slow and tortuous in spite of the quality of the technological advances offered by the new development. Data generation and

    Jan 1, 1990