Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    HORIZONTAL - A Matrix-Independent Generic Sampling Standard

    We outline a first version of an ambitious goal: The world's first horizontal (matrix-independent) generic sampling standard. The specific needs and requirements are overwhelming, as all the worl

    Mar 1, 2010

  • AUSIMM
    Broken Hill Metallurgy - A Story of Innovations in Processes, Equipment and Instruments

    By AJ LYNCH

    Broken Hill metallurgists have been responsible for some of the most important developments in mineral processing technology. These occurred mainly in two periods, 1902 - 15 and 1955 - 70. Mineral

    Jan 1, 1992

  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    Strong Acid Leaching and Filtration of Lead/Silver Residue

    By Adams R. W

    A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February

    Jan 1, 1989

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Pelletisation of New Zealand titanomagnetite ironsand for hydrogen direct reduction

    By B H. Yin, S Mendoza, M Nusheh' C W Bumby, A Zhang

    Hydrogen-direct-reduction of iron ore in a vertical shaft furnace is a potential process that could significantly reduce CO2 emissions from the steel industry. This approach requires the pelletisation

    Sep 18, 2023

  • AUSIMM
    Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surface

    By B Wu, C Zhao, B Lei

    At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur

    Oct 12, 2022

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    Evaluation of Cyclical Voltammetry as an Electrolyte Screening Technique

    By Grady B. V O, Cavell K. J, Ault A. R, Newman O. M G, Malcolm J. McPhersqn

    Cyclic voltammetry (CV) has been evaluated as a technique for monitoring the quality of an industrial zinc sulphate electrolyte. The basis of the method involves measuring a change in the polarisati

    Jan 1, 1993

  • AUSIMM
    Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis method

    By J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai

    Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur

    Aug 21, 2024

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and Leading

    By J Nixon

    I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co

    Mar 21, 2011