Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Achieving High Flotation Recoveries from Browns Polymetallic OreBy G Hayes
Ore from the Browns deposit near Batchelor, in the Northern Territory of Australia, is a fine-grained polymetallic sulfide ore hosted in graphitic black shale. Minerals of economic significance are se
Jan 1, 2002
-
Magnetite in Nickel SmeltingBy R Sridhar, M Fe, W G. Bacon
The problems of magnetite build-up have plagued the non-ferrous pyrometallurgical industry for many years. To better understand these problems, a study was undertaken to determine the thermodynamic va
Jan 1, 2000
-
The Effect of Ionic Contaminants on the Setting Behaviour of Geopolymeric GelsBy J S. J van Deventer
Geopolymerisation is a new technology that processes and transforms aluminosilicate minerals into mechanically strong and chemically stable products. In this investigation, minerals such as fly ash an
Jan 1, 2000
-
Groundwater modelling support for closure approvals at Ranger Uranium MineBy J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka
Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and
Jul 1, 2021
-
Application of Genetic Algorithms for Reliability Assessment of Two Mine Hoisting SystemsThis paper discusses the application of a computerised model based on genetic algorithms (GAs), called GenRel, for reliability assessment of underground mine hoisting systems. The purpose of this pape
Dec 6, 2010
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
Kinetics of Reclamation of E-Waste by a Bioleaching RouteKinetics of Reclamation of E-Waste by a Bioleaching Route
Sep 13, 2010
-
Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene ChallengesBy O van Baalen
The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p
Mar 21, 2011
-
Automated Mineralogy for Ore Characterisation and Plant OptimisationBy Y Gu, R Fandrich
Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat
Jan 1, 2007
-
Methodology development of electrical conductivity measurements for non-ferrous slagsBy L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens
As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco
Jun 19, 2024
-
Mount Morgan Gold-Copper Deposit:: The 1992 PerspectiveBy Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L
The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis
Jan 1, 1993
-
Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailingsBy D J. Williams, S Islam
Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad
Jul 23, 2018
-
Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern CapeBy L A. Balzan, F Nieuwenhuys
GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi
Nov 8, 2021
-
The Development of ‘Radial-in-Reef’ Stoping at the Tasmania Gold Mine, Beaconsfield, TasmaniaBy R Goddard
An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as ‘Radial-in-Reef’ (RiR) stoping, the method employs the drill
Mar 21, 2011
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-
A HPGR pseudo-dynamic model approach integrated with real-time information for pressing iron ore concentrates in industrial-scaleBy T M. Campos, H A. Petit, L M. Tavares, R Olympio
Much practical experience has been gathered in the last 30 years of application of high-pressure grinding rolls (HPGR) integrated with ball milling in size reduction of fine iron ore concentrates. The
Aug 24, 2022
-
Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnaceBy S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka
The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of
Jun 19, 2024
-
The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South AustraliaGeotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been sho
Jan 1, 1986
-
Safety Culture and Resilience Engineering - Exploring Theory and Application in Improving Gold Mining SafetyContemporary approaches to safety management appear to be failing short of meeting its mark in improving mine safety. This is evidenced by the high workers compensation, high incidence rates and fatal
Aug 1, 2010