Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Appendix E - Equipment Used For Field Testing Of Mine Sealing SystemBy David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX E EQUIPMENT USED FOR FIELD TESTING OF MINE SEALING SYSTEM I. Drilling Operation - Equipment supplied by local drilling contractor 1. Mobile drill rig. 2. Flat bed truck, containing 2
Jan 1, 1973
-
Appendix E - Refuge Chamber Leakage AnalysisBy David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX E REFUGE CHAMBER LEAKAGE ANALYSIS Variables p 0 = pressure outside of chamber (psi) p = pressure inside of chamber (psi) i q = leakage flow rate (cfm) Q= total leakage (cu ft. ) V
Jan 1, 1976
-
-
Appendix F - Simulation Summaries of the Uranium and Lead MinesBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Jan 1, 1986
-
Appendix G – Input Data fort initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 9 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY; PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 27
Jan 1, 1977
-
Appendix H – Computer Output for Initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix I - Cost Analysis SystemBy R. V. Ramani, V. T. Burgos, J. A. McClay
Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl
Jan 1, 1975
-
Appendix I - The Art of Creating a Financially Rewarding RoyaltyBy Craig Haase
A. Introduction
Jan 1, 2003
-
Appendix I – Addition of Andrews Shafts – Input DataBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.
Jan 1, 1977
-
Appendix I – Computer Program ListingBy R. V. Ramani, C. B. Manula, A. Owili-Eger
• MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(
Jan 1, 1975
-
Appendix II – Model Verification Test IBy R. V. Ramani, V. T. Burgos, J. A. McClay
The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining
Jan 1, 1975
-
Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutionsBy R. V. Ramani, C. B. Manula, A. Owili-Eger
PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I
Jan 1, 1975
-
Appendix II. Royalty Check ListBy Karl J. C. Harries
"The following is an outline or check sheet of some things that might be looked at when considering the concept of a royalty or royalty provisions. It is not intended as a guide to what is right or wr
Jan 1, 2003
-
Appendix III - Analytical Pressure - Volume Computations For The Mine PrototypeBy R. V. Ramani, C. B. Manula, A. Owili-Eger
ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in
Jan 1, 1975
-
Appendix III - Joint Venture Agreement Table of Contents, AnnotatedBy Karl J. C. Harries
"The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature
Jan 1, 2003
-
Appendix III – Model Verification Test IIBy R. V. Ramani, V. T. Burgos, J. A. McClay
The data for Test I1 describes an underground bituminous coal mine operating in a 72 inch seam, with an estimated production rate of 4,257,000 tons per year. The system includes 15 continuous mining s
Jan 1, 1975
-
Appendix IV – Cost Data LibraryBy R. V. Ramani, V. T. Burgos, J. A. McClay
Cost Data Library The data retained in the Cost Data Library is of a semi¬permanent nature in that it is held in storage for immediate use with the program although its contents may require periodi
Jan 1, 1975
-
Appendix IV – User’s IndexBy R. V. Ramani, C. B. Manula, A. Owili-Eger
All the input data required to operate the ventilation simulator except the title, are entered with I10 or F1O.O formats. The title is entered with (18A4) format. The floating points are designated by
Jan 1, 1975
-
Appendix J ? Variability In Sampling And Analytical Methods - J.1 MSHA Gravimetric Method For Respirable Coal Mine DustThe current procedure for measuring the concentration of respirable coal mine dust is as follows. Each filter is preweighed by the filter manufacturer to ±0.1 mg. Following sampling with the Coal Mine
Jan 1, 1997
-
Appendix J – Additions of Andrews Shaft – Computer OutputBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977