Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Identifying Moisture Sensitive Roof Rocks in Coal Mines

    By Gregory M. Molinda

    Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M

    Jan 1, 2006

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Longwall Support Monitoring

    By Robert G. Harris

    During the last five years there have been significant improvements in face support monitoring techniques particularly in respect of face pressure. The measurement of support loading pressures was

    Jan 1, 1993

  • SME-ICGCM
    Field Test Results On Dyna-Rok And Dyna-Rok Plus Anchors

    By James J. Scott

    Research and development has been carried out on the patented Dynamic Rock Anchor, tradenamed DYNA-ROK and DYNA-ROK PLUS Anchors, which are manufactured and marketed by Ingersoll-Rand Company. This pa

    Jan 1, 1990

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    Application Of Seismic Tomography In Underground Mining

    By D. F. Scott

    Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s

    Jan 1, 1996

  • SME-ICGCM
    Applied Geomechanics for Support Design in German Deep Coal Mines

    By Holger Witthaus

    Beside the traditional geomechanical evaluation methods the geotechnical parameters are recognized as important facts of the planning work for multiple seam mining. Standards for applied monitoring an

    Jan 1, 2006

  • SME-ICGCM
    Complex Seismic Trace Attributes In Coal Exploration

    By Lawrence M. Gochioco

    The interpretation of coal seismic data requires a certain precision and accuracy to make the results more reliable. The signature of the seismic wavelet provides a host of valuable geologic informati

    Jan 1, 1989

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    The research on the mechanical properties of hard roof in underground coal mining

    By Xu Lin Sheng

    During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th

    Jan 1, 1989

  • SME-ICGCM
    Roof Control Under Conditions of Shallow Depth and High Horizontal Stress Field -A Case Study

    By Yajie Wang

    Traditionally, roof falls are usually attributed to bad roof strata and high vertical stress related to the overburden depth. However, roof falls under shallow overburden depth are oflen caused by a h

    Jan 1, 1998

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    Numerical Analysis of Some Geotechnical Factors Influencing the Application of Longwall Top Coal Caving

    By Dao Hong Quang

    This paper describes the numerical analysis of some geotechnical factors influencing the application of Longwall Top Coal Caving (LTCC) method. The study was aimed at comparing the differences in stre

    Jan 1, 2008