    Airblast Reduction from Effective Blasthole Stemming

    By Duane Skidmore, Francis Otuonye, Calvin J. Konya

    Proper stemming not only affects the rock breakage process, but also controls the unwanted side effects of blasting such as airblast, ground vibration, and flyrock. Little research has been conducted

    Jan 1, 1982

  • ISEE
    Knocking Down Barriers to QRA Acceptance

    By Jorge Flores, Dean Nichols

    Some view quantitative risk assessment (QRA) as difficult to understand and complicated to use. They are comfortable with the proven reliability of quantity distance (QD) and question the benefits of

    Jan 1, 2015

  • ISEE
    Journal: 100 Years / A Trip Through The Anthracite Coal Mines

    By Robert Hopler

    RBH Note: in 1913 black powder was still dominant as a coal-mining explosive, but permissible explosives were making some slight headway. For example, in 1902 there were only 11,300 pounds of permissi

    Jan 1, 2014

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Impact of Blasting on Resource Recovery, Mining Profit, Safety, and the Environment

    By Z X. Zhang

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    Ring Blasting Mine to Mill Optimization

    By Joel Chipana, Roberto Laredo, Benjamin Cebrian

    Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro

    Jan 1, 2017

  • ISEE
    Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion Product

    By Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs

    Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g

    Feb 6, 2023

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Public Perception of Blasting at Rock Quarries in Expanding Urban Environments - St. Charles County, MO

    By Paul Worsey, Braden Lusk

    Differences exist between public perception of construction blasting and quarry blasting. In general, people are able to tolerate short term inconveniences much better than long term ones. The paper f

    Jan 1, 2005

  • ISEE
    Calculating Shock Wave Over pressure from High-Speed Video

    By Catherine Johnson, Kelly Williams

    The ability to measure the overpressure of a shock wave is necessary for explosives research such as shockwave focusing and field testing of blast-resistant designs for buildings and vehicles. To reco

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    The Use of Electronic Detonators to Control Air Blast

    By Andy Hudson, Stuart Brashear, David Lilly

    Because of greatly increased timing accuracy, electronic detonator systems are a well-known and widely accepted major tool to control and reduce ground vibration. At a Southeastern quarry the authors

    Jan 1, 2009

  • ISEE
    Conversion from Two-Pass Overburden Removal to Cast Blasting at Simplot Phosphates

    By Dale Preece, Steven Case, Cassidy McAllister

    Simplot Phosphates produces high quality phosphate fertilizer through open pit mining. The operation near Vernal, UT began as a three-pass mining process carried out with drill and blast followed by t

    Jan 1, 2012

  • ISEE
    Journal: Safety Talk / Pump Protection Systems on Mobile Equipment Recommended Safety Program

    By Tom Watts

    The practice of pumping bulk blasting agents is regulated by many agencies around the world. The explosives manufacturers have done an excellent job of hazard and operability studies allowing criteria

    Jan 1, 2011

  • ISEE
    Journal: You Be the Judge - A Study on Ethics

    The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W

    Jan 1, 2007

  • ISEE
    The Importance of Keeping Accurate Records Time Trails

    By Brad Bockey

    Whether you are a driver, blaster, or are in charge of filing, you must recognize the importance associated with DOT-required recordkeeping. As various agencies become intertwined with rules governing

    Jan 1, 2011

  • ISEE
    Journal: Safety Talk, Managing the Blast Site (The Known Unknowns)

    By William Reisz

    Managing the blast site at almost any operation can be a daunting task. There are so many details that must be observed, understood, and acted upon. It goes without saying that there are no two locati

    Jan 1, 2014

  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    Journal: Safety Talk, The Blaster’s Duty of Care

    By William Reisz

    In our line of work,like many other professions, there may be times when circumstances or a series of events may arise, contributing toward unacceptable risk. When multiple parties are involved, there