Rock Socket Capacity Certification Using the Point Load Index Test
By Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde
Jan 1, 1900
-
Building Above And Excavating Below An Iconic Building In Manhattan
By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach
By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
The Impact Of End Bearing Plate On Micropile Capacity Casted In Cohesive Soil
By Soorkty Elarabi
The aim of this paper is to discuss the impact of end bearing plate on the capacity of micropile. Preliminary studies have been made in Sudan in specific area of cohesive soil. Experimental works were
Oct 1, 2022
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site Ii
By Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall
By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Behavior Of Piled Raft Foundation Systems Under A Combined Set Of Loadings
By Renato P. Cunha
The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa
Jan 1, 2006
-
Artificial Ground Freezing: A Smart Application Below The Airport Of Perth
By Luca Pingue, Regine Jagow-Klaff, Franco Muratore, Carlandrea Albonico, Damiano Frontini, Rudolf Wernecké
This paper describes an artificial ground freezing (AGF) application carried out to ensure both watertightness and structural support for the safe excavation of four cross passages of the Forrestfield
May 1, 2022
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)
By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia
By Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015
-
Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive Strength
By Dominic Parmantier, Jason Page
"In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c
Jan 1, 2015
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing
By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy
By Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
An Analysis of LRFD for Helical Anchors
By Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam
By Mario Mauro
Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-
Jan 1, 2008
-
Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)
By John D. Nelson
Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot
Aug 1, 2013
-
DFI Collaborates on Risk-Based Panels
By Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St Century
By David Wilshaw
Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves
Oct 1, 2022
-
Interpretation and Evaluation of Thermal Integrity Profiling Measurements
By Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Westlink Projects – Geotechnical Challenges During The Execution Phase
By Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022