Pile Foundation Response to Ground Vibration from Rock Blasting
By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui
"Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign
Jan 1, 1900
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)
By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia
By Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Deep Excavation with Well Point Dewatering in Soft Soil
By Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge
By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy
"The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the
Jan 1, 2015
-
Using Pile Reinforcement To Mitigate Multimodal Slope Failures: A 3D Lem Case Study
By Javankhoshdel Yacoub
Piles are often used to reinforce slopes as they increase the available restoring force when calculating the factor of safety against sliding. In this paper, a 3D model of a slope containing multiple
Oct 1, 2022
-
Ethical and Risk Aspects of Deep Foundation Subcontracts
By Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour
By Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment
By Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Atoka Pipeline - Canadian River Crossing
By Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall
By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Aseismic and Anti-Tsunami Upgrades of Existing Coastal Levees and Seawalls in High Risk Regions
By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"Japan’s Great Tohoku Earthquake and the immediately following tsunami of March 11, 2011 killed more than fifteen thousand people and destroyed numerous buildings and infrastructures in the northeaste
Jan 1, 2017
-
Load Tests on Drilled Shafts at Goethals Bridge Replacement
By John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study
By Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling
By Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone
By Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Experimental Studies On Behaviour Of Single Pile Under Combined Uplift And Lateral Loads
By K. Madhusudan Reddy
Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combine