    Negative Drag Reduction On Spliced Piles - An Insitu Study - Synopsis

    By Gopal Ranjan

    An insitu prtotype study on precast driven spliced piles in soft marine clay deposit has been carried out to study negative drag. The drag is generated by loading the ambient clay. For reduction in ne

    Jan 1, 1996

  • DFI
    Settlement Control Of A Road Embankment Using Vertical Drains

    By Wei Tu

    A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that

    Jan 1, 2009

  • DFI
    Innovation In South East Asia - Synopsis

    By Brian Littlechild

    Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting

    Jan 1, 2000

  • DFI
    Micropiles For Rehabilitation Of Two Existing Structures

    By Jeffrey R. Hill

    This paper discusses the use of micropiles for the rehabilitation of the following two structures: the Milwaukee Auditorium Theatre, in Milwaukee, Wisconsin, and the Cupples Ballpark Lofts, in St. Lou

    Jan 1, 2008

  • DFI
    Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United States

    By David R. Black

    Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for

    Jan 1, 2002

  • DFI
    The Practical Application Of Pile Reuse At Bow Bells House, City Of London

    By Justin Phillips

    The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin

    Jan 1, 2008

  • DFI
    Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay Bridge

    By Saba Mohan

    This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t

    Jan 1, 2002

  • DFI
    Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat Foundation

    By Darrell Wilder

    The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the

    Jan 1, 2008

  • DFI
    Seismoacoustic Effects Of Driving Large Diameter Piles ? Summary

    By Barry C. Roth

    Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground

    Jan 1, 2001

  • DFI
    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - Implementation

    By Darrell L. Beddard

    The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t

    Jan 1, 1996

  • DFI
    An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building Support

    By Scott M. Doehla

    A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of

    Jan 1, 2008

  • DFI
    Double Rotary Head Piling Systems (Cased CFA)

    By Franz-Werner Gerressen

    In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established

    Jan 1, 2009

  • DFI
    Environmentally Friendly Geothermal Piles At Keble College, Oxford, UK

    By Tony P. Suckling

    This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct

    Jan 1, 2002

  • DFI
    7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction

    By Aly M. Mohammad

    The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent

    Jan 1, 2003

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation Support

    By Paul J. Sabatini

    Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1998

  • DFI
    Behaviour Of Laterally-Loaded Piles Centrifugal And Numerical Modelling ? Synopsis

    By W. H. Craig

    Techniques have been developed for installing model piles into beds of soil under high sustained acceleration levels aboard a centrifuge. These piles have been subjected to static and/or cyclic latera

    Jan 1, 2010

  • DFI
    Ground Improvement Resulting From Installation Of Drilled Displacement Piles

    By Timothy C. Siegel

    Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o

    Jan 1, 2007