Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
2D Analysis Of The Seismic Behavior Of Inclined Micropiles
By Seyyed Mehdi Radeghi Mehrjou
The current work investigates the behavior of inclined micropiles under seismic loads. The dynamic finite element method (FEM) was employed. Rayleigh damping was applied to the soil, and elastic beam
Sep 1, 2022
-
Design-Build Synergy To Deliver Pile Foundations
By David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? Synopsis
By J. P. Burland
The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a
Jan 1, 2010
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off Walls
By Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis
By Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure Interaction
By Ahmad Mahboubi
The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at
Jan 1, 2010
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program
By William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
AN EXPERIMENTAL INVESTIGATION ON THE BENEFITS OF A HYBRID PILE/FOOTING SYSTEM ON SAND
By Mohammed Al Maadheedi
This paper explores the capacity effects of a square steel plate welded at the ground surface on a driven open-ended steel pile (i.e. the plate would touch the ground surface after the pile achieves t
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.
By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
An Experimental Investigation On The Benefits Of A Hybrid Pile/footing System On Sand
By Nick Hytiris, Mohammed Al Maadheedi, Slobodan B. Mickovski
This paper explores the capacity effects of a square steel plate welded at the ground surface on a driven open-ended steel pile (i.e. the plate would touch the ground surface after the pile achieves t
-
Anchored Diaphragm Wall and Dewatering System for Libya Hotel
By Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya Hotel
By Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Design And Testing Of Deep Foundations For Wind Turbines In Western Alaska
By Lorie M. Dilley
Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an
Jan 1, 2010
-
Application of Non-Destructive Testing to Drilled Shafts
Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Long Term Performance of Grouts and the Effects of Grout By-Products
By Stephan A. Jefferis
I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the
Feb 10, 2003
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage Tunnel
By Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)
By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San Francisco
By Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Fogg Museum Expansion - Support of Excavation Design and Construction
By James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface Construction
By Julie Clarke
In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe
Jan 1, 2009