Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Chapter III- Continued - Part 6.-Porcupine-Ramore Area - Structural Relations of the Porcupine Ore Deposits

    By W. Roy Dunbar

    "The Porcupine area is in northern Ontario at the intersection of N. Lat. 48° 30' and 81° W. Long. It is 125 miles due north of the Sudbury nickel range. Practically all the mineral production of this

    Jan 1, 1954

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004

  • CIM
    Utilization of Alberta Sub-Bituminous Coal

    By W. A. Lang

    COAL of sub-bituminous rank underlies much of the plains area of Alberta. This coal is geo-logically young, and occurs in Belly River and Edmonton strata of Up-per Cretaceous age. Generally, the seams

    Jan 1, 1958

  • CIM
    Huckleberry Mines Ltd. Process Design and Project Startup

    By Greg Rasmussen

    "Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b

    Jan 1, 1998

  • CIM
    The Seven Delusions in Disaster-Prone Organizations (00ec0c95-937d-473b-9762-40a685fd5e37)

    By Marius Jacobs

    "Safety performance in many companies and even industries has stalled in the few years. Accidents rates are at a "plateau" and yet, serious accidents and fatality rates are not. In more dramatic cases

    Jan 1, 2014

  • CIM
    Using Piston-Die Press to Predict the Breakage Behaviour of HPGR

    By J. T. Kalala

    The High Pressure Grinding Roll (HPGR) is gaining acceptance in the mineral processing industry and has become a competitive technology in reducing the specific energy consumption in Mineral processin

    Jan 1, 2012

  • CIM
    The State of Art in Environmentally Sustainable Nickel Smelting: Boliden Harjavalta Nickel Smelter

    By P. Pyykkö, E. Peuraniemi, J. Järvi, P. V. Latostenmaa, V. Törölä, S. Junnikkala

    "Nickel concentrate smelting started in Harjavalta in 1959. First, flash smelting - Peirce-Smith converting route was applied, and the high-grade converter matte was further refined to nickel cathodes

    Jan 1, 2014

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Points of View on the Rock-Burst Problem

    By R. G. K. Morrison

    As mines grow deeper, the problem of ground control becomes one of increasing importance. The literature on the subject has grown extensively in the past few years, but is still far from conclusive. D

    Jan 1, 1939

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Are Ferronickel Furnaces at Thermodynamic Equilibrium?

    By M. Y. Solar, W. G. Davenport

    Most of the recent growth in nickel demand has been for the production of stainless steels and virtually all of it has been satisfied by new ferronickel and nickel pig iron projects. But "good" lateri

    Jan 1, 2014

  • CIM
    Study on Recovery Process for Ruthenium from Scraps by Hydrometallurgical Methods

    By Y. Nakamura, T. H. Okabe, S. A. Sunkar, K. Nose

    Ruthenium (Ru) is known as a platinum group element with a very small production volume. In fact, the worldwide annual production of primary Ru metal is only about 20-30 tons, and it depends on the am

    Jan 1, 2014

  • CIM
    Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTS

    By Phillip J. Mackey, Gerardo R. F. Alvear F.

    It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to

    Jan 1, 2014

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999

  • CIM
    Sustainable Manufacture: A Dilemma or Window of Opportunity?

    By M. H. Attia

    The concept of sustainable development has been evolved into a working framework for sustainable manufacturing, in which the environmental requirements are introduced into product development at the d

    Jan 1, 2006

  • CIM
    Significant Strides Toward Ree Production in Canada

    By I. M. London, G. P. Hatch

    The Canadian Rare Earth Elements Network (CREEN) was formally launched at the Rare Earth Symposium at The Metallurgy and Materials Society of CIM (MetSoc) Conference of Metallurgists in October 2013.

    Jan 1, 2014

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012