Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Is the Mineral Resource Grade Estimate Realistic?

    By Terry A. Lee

    The grade of mineral resource estimates underpin all major economic considerations of mining prospects. While there are reporting requirements to satisfy when stating a mineral resource estimate, an

    Apr 1, 2005

  • CIM
    Destruction of Cyanide in Tailing Pond Reclaim Water Using Peroxymonosulfuric Acid at Barrick Goldstrike

    By M. Drozd, A. Ibrado, P. Butcher

    While effective in treating refractory sulfide ores, pressure oxidation leaves carbonaceous matter unscathed and able to adsorb gold from cyanide solutions. Barrick Goldstrike's strategy to mitig

    Jan 1, 2005

  • CIM
    Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case History

    By E. Bongajum

    We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical

    May 1, 2009

  • CIM
    Laboratoire d?analyse des fluids

    By Valérie Tremblay

    Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;

    Feb 1, 2008

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    May 1, 2009

  • CIM
    Adjunct Chemical Dust Control Strategies for High Tonnage Mining Operations

    By Brian Danyliw

    "Dust control is an increasingly important consideration for all mining operations from a health, safety, environmental and maintenance perspective. Modern mining operations incorporate a variety of m

    Jan 1, 2015

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    A New Rheoforming Processing Of Semi-Solid Aluminum Alloys

    By J-L. Tang

    A new rhcoforming processing of Al alloys with component shaping systems apart from slurry preparation systems is experimentally exploited, using the reversible multilevel-speed electromagnetic stirre

    Jan 1, 2007

  • CIM
    The Future of Environmental Regulation: Saskatchewan’s Move to Results-Based Regulation

    By K. M. Murphy, M. B. Wittrup

    ABSTRACT The Saskatchewan Ministry of Environment recognizes the importance of environmental protection as an important contributor to Saskatchewan’s economy, with the environmental performance of ind

    Jan 1, 2012

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • CIM
    Pneumatic Flotation Technology an Interesting Experience in the Chilean Mining Industry

    By Flavio Rojos-Tapia, Samuel Sánchez-Pino, Marcelo Fernández-García, Samuel Sánchez-Baquedano, Rainer M. Imhof

    "Pneumatic flotation was introduced to the Chilean copper mining industry in 1993 by Ingeniería de Minerales S.A., being implementation in 1994/95. The technology is based on the designs and developme

    Jan 1, 2003

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • CIM
    Flotation Treatment of Complex Sulphide Ores

    By M. J. Fairweather

    "The development of means to maximize the selectivity between galena and sphalerite in lead zinc ores is extremely important to the lead-zinc industry. Two challenging studies recently undertaken by C

    Jan 1, 1991

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    The Boseto Copper Project

    By Brad Sampson

    Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History

    May 1, 2010