Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Surface Instabilities from Buried ExplosionsBy Daniel P. Lathrop, Leslie C. Taylor, William L. Fourney
Except when the target is on the surface, e.g. a tank track, the most important loading mechanism from a buried charge on a target above it is the impact of soil propelled at the target by the expandi
Jan 1, 2009
 - 
                    
                Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion DrillingBy Gary Cavanough, Stuart Addinell, Hector Parra
Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an
Jan 1, 2013
 - 
                    
                RI 4064 Metallurgical Research Program of Bureau of Mines Relating to the Nonferrous MetalsBy S. S. Dean, B. Silkes
"INTRODUCTION The metallurgical-research program of the Bureau of Mines .for the past 15 years has emphasized the production of high-purity nonferreus metals through the utilization of our available r
May 1, 1947
 - 
                    
                RI 7936 Reducing Surface Hot Shortness of Copper-Containing Steels Using Silicon Additions and Controlled Reheating ConditionsBy Mark I. Copeland
This study was conducted by the Bureau of Mines to determine the effect of steel reheating practices in burning natural gas on the amount of silicon required to prevent the formation of copper on stee
Jan 1, 1974
 - 
                    
                Water and Slurry Bulkheads in Underground Coal Mines: Design, Monitoring, and Safety ConcernsBy S. Harteis, D. Dolinar
Many mining operations rely on bulkheads to provide a barrier between impounded water or slurry and active mine workings. However, bulkhead failures could cause and have caused catastrophic flooding
 - 
                    
                Processing Of Antimony At The Sunshine MineBy Corby G. Anderson
Antimony has been utilized by mankind for thousands of years. However, due to recent environmental concerns, antimony is often considered to be an impurity element, Since antimnoy is commonly found i
Jan 1, 1992
 - 
                    
                Limestone quarry quality optimization for a cement factory in Turkey - SynopsisBy A. H. Onur
Many factors govern the size and shape of an open pit, and these must be properly understood and used in the short and long-term planning of any open pit and quarrying operation. The importance of eac
Jan 1, 2008
 - 
                    
                OFR-13-87 Demonstration Of Minos Coal Clearance System - Final Report: Installation, Operation And Assessment Of Results Of The MINOS System At Barnes & Tucker No 20 MineBy G. S. Beaumont
This report presents a programme of work to demonstrate the use of a surface-based centralised computer control system for the remote monitoring and control of underground conveyors in a US coal mine.
Jan 1, 1986
 - 
                    
                The Electrolytic Refining and Smelting Company of Australia LimitedPower Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian
Jan 1, 1938
 - 
                    
                Stope Stability Monitoring at the Goldex MineBy Patrick Frenette
The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45
May 1, 2011
 - 
                    
                The Canadian Experience ù Disclosure Standards for Mineral ProjectsAfter considerable input from the mining industry, the Canadian Securities Administrators (CSA) finalised National Instrument 43-101: Standards of Disclosure for Mineral Projects. This Instrument, whi
Jan 1, 2002
 - 
                    
                Influence of the Tower Mill’s Classifying Column Structure on the Size of Collected Products (5aad4b18-8c38-4f26-85f0-b8453dd4c09f)By Takashi Furuyama, Sukeyuki Mori, Takafumi Okuma, Norio Hashiguchi
The Tower mill KD-3 is an improved version of the laboratory mills VD-1, KD-1 and KD-2 in which the classifying column has been modified to ensure a quick discharge of products from the comminution se
Jan 1, 2003
 - 
                    
                The 8 Millisecond, "Criterion": Have We Delayed Too Long in Questioning It?By Douglas A. Anderson
The simplest method used to predict ground vibration from blasting is scaled distance -the distance from a blast divided by the square root of the Pounds per delay. Pounds per delay is defined as the
Jan 1, 1989
 - 
                    
                The Origins Of Public Concern With Taconite And Human Health: Reserve Mining And The Asbestos CaseBy Michael E. Berndt
Asbestos first became an issue to Minnesota?s iron industry when it was revealed that mineral fibers similar to those in Reserve Mining?s tailings were being found in drinking water for several commun
Jan 1, 2007
 - 
                    
                Integrated Underground Mining and Processing Of Massive Sulphide OresBy Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber
"It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min
Jan 1, 2006
 - 
                    
                Commissioning and Operating Experience with Gekko’s Gold Ore Treatment PlantsBy Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
 - 
                    
                The Coal Industry of New South WalesAs it is probable that a large proportion of the members of the Institute attending this meeting are connected with the metalliferous side of mining, the writer thought that, as coal and coke are requ
Jan 1, 1918
 - 
                    
                Reservoir Engineering – Laboratory Research - The Effect of Temperature on the Permeability Ratio of Different Fluid Pairs in Two-Phase SystemsBy L. B. Davidson
The petroleum literature contains many reports on the relative permeability properties of porous media. However, only recently have studies of relative permeability at elevated temperatures been made.
Jan 1, 1970
 - 
                    
                Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit"In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat
Jan 1, 2014
 - 
                    
                The Real Cost of Material Handling Problems – And How to Avoid ThemBy T. Holmes
Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>
Jan 1, 2019