Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Roof Falls And Caving In Longwall Mining Operations
By Kot F. Unrug
Since the introduction of longwall systems, the prediction of roof behavior and support requirements have become the major issue referring directly to safety as well as productivity. In more recen
Jan 1, 1982
-
Classification Of Mine-Related Subsidence East Of Mississippi River, U.S.A.
By Jesse L. Craft
Field investigation of surface subsidence events associated with both active and abandoned underground coal mines in the United States has established criteria that enable the prediction and classific
Jan 1, 1992
-
Whole-Mine Subsidence over Tabular Deposits and Related Seismicity
By William G. Pariseau, Michael K. McCarter
"The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc
Jan 1, 2016
-
Think Like a Rock
By Tom Barczak
Early in my career, while giving a presentation on shield design for longwall mining at one of the International Conferences on Ground Control in Mining, the late Jim Scott told me that I was finally
Jan 1, 2011
-
Risk Analysis and Risk Ranking in Tunneling: A Case Study
By Behdeen Oraee
Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s
Jan 1, 2014
-
Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building
By Gennaro G. Marino
As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w
Jan 1, 2013
-
Ground Control Aspects of a Successful Underground Coal Mine Trial in Weak Strata in Indonesia
By Andrew Lewis, Amarit Nitaramorn, Alexander Garcia, Peter Altounyan
"Indonesia is a major coal producer, the vast majority being sourced from opencast operations. Underground production to date has been constrained by unfavorable ground conditions and limited local ex
Jan 1, 2010
-
A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof Falls
By Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger
"Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the
Jan 1, 2015
-
Load Transfer Distance Measurements at Two Mines in the Western U.S.
By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs
Jan 1, 2015
-
Panel?scale Modeling of a Deep Longwall Panel: the MULSIM Alternative
By Mark K. Larson
Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the
Jan 1, 2013
-
Experimental Observations and Interpretations on Fracture Networks, Strength and Deformability of Coal Masses under Three?Dimensional Loading Conditions
By Peng-Fei He
CT scanning tests were used to detect the pre-existing fracture systems of 36 cubical coal blocks. Systematic procedures were developed to construct the pre-existing fracture geometry of the cubical c
Jan 1, 2014
-
Roof Span Design for Underground Stone Mines
By Essie Esterhuizen, John Ellenberger, Dennis Dolinar
"Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us
Jan 1, 2010
-
Ground Pressure Control With Use Of Freezing Rocks On The Ore Deposits Of Yakutia
By G. P. Neobutov
The near surface inclined gold ore deposit is mined out at freezing temperature. The replacement of ore pillars by artificial freezing rocks during the rock pressures control in this conditions presen
Jan 1, 1996
-
Development of a Six Drilhead Roof Bolting Machine
By Bill A. Kyslinger
"In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design
Jan 1, 2016
-
Study on Environmental Management of Mining Subsidence Areas
By Weijia Guo
With the exploitation of coal resources, a large area of land had been affected by surface subsidence, causing conflicts between man and land to become more conspicuous by the day, affecting the life
Jan 1, 2006
-
Investigation of Rock Mass Stability around Tunnels in an Underground Mine in USA by 3-D numerical modeling
By L. A. Sandbak, Yan Xing
"The purpose of this study is to evaluate the rock mass stability around the tunnels by three-dimensional (3-D) numerical modeling. Complex geological and tunnel features have been included in the mod
Jan 1, 2016
-
3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine
By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake
"Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and
Jan 1, 2016
-
Remote Sensing For Roof Control And Mine Planning: An Overview
By R. F. Valene
This paper is not available for inclusion in the Proceedings at the time of printing. but it will be included as an insert
Jan 1, 1984
-
Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures
By Arka Jyoti Das, Prabhat Kumar Mandal
"Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv
Jan 1, 2016
-
Letter Of Nomination
By Dr. Daniel W. H. Su
t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving
Jan 1, 2006