Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Physical Limnology Of Existing Mine Pit Lakes (4b36d4c4-ac28-4599-ab7b-6cb1a2d5afd1)

    By G. A. Doyle

    The quality of water in mine pit lakes depends in part on the physical limnology (Le. stratification, turnover, and development of anoxic conditions with depth) of the lake. Limnologic data collected

    Jan 1, 1996

  • SME
    Block Cave Production Scheduling Using PCBC

    By T. Diering

    Gemcom PCBCTM is a software package which has been developed over the last 22 years for the planning and scheduling of block cave mines. This paper presents an update of the various research and devel

    Jan 1, 2010

  • SME
    Mine Ventilation Monitoring – Comparing Best Practices in Australia, Germany and the United States

    By J. F. Brune

    "Re-occurring face ignitions in U.S. coal mines are concerning and require a closer look at air quality monitoring systems and practices employed in these mines. The explosion disaster at the Upper Bi

    Jan 1, 2016

  • SME
    Optimization of High‑grade Fluorspar Recovery from Rare Earth Element Carbonatite Deposit Using Column Flotation

    By Kristin K. Mueller, Lucie Coudert, Thi Yen Chau Nguyen, Lan Huong Tran, Jean‑François Blais, Guy Mercier

    Fluorite (calcium fluoride—CaF2), also known as fluorspar, is an industrial mineral used in metallurgy, hydrofluoric acid production, and ceramics manufacturing. Based on the results from a previous s

    Sep 9, 2022

  • SME
    Towards The Concentration Of Gold-rich Arsenopyrite And Rejection Of Gangue Pyrite From An Auriferous Concentrate - SME Annual Meeting 2022

    By R. Asamoah, P. Forson, W. Skinner, M. Zanin

    Despite the seeming benefits decoupling pyrite and arsenopyrite minerals present in practice, little success has been achieved. The present study presents possible process routes for attaining selecti

    Mar 2, 2022

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • SME
    Conducting Sustainable Development Concurrently With The Reclamation Of Abandoned Mines At The French Gulch Site Near Breckenridge, Colorado

    By V. L. Ketellapper

    This paper discusses the technical issues and stakeholder collaborative processes which resulted in achieving a balance between the reclamation of abandoned mine sites, providing affordable housing, a

    Jan 1, 2004

  • SME
    Broken Aro Remining/Reclamation Project

    By S. Mafi

    The Broken Aro project is associated with a 1910 abandoned underground mine complex that has been discharging aeid mine drainage from entries, seeps and springs. The Ohio Department of Natural Resourc

    Jan 1, 1998

  • SME
    Coal Availability Studies, Fruitland and Menefee Formations, San Juan Basin, New Mexico (5cdda138-97f6-47d0-aaa8-3acb0981a597)

    By G. E. Jones, G. K. Hoffman

    Through the USGS National Coal Availability pro-gram, two San Juan Basin studies have been completed. The study areas are in the northwest Bisti field, Fruitland Formation and in the eastern Standing

    Jan 1, 2000

  • SME
    Unique Characteristics for the Design and Construction of the New Twin Tunnel “Caltanissetta”, on Highway 640 in Sicily, Italy - Practical Experience in Using ø15.08 m (50 feet) Diameter E.P.B. Machine

    By Pier Francesco Paglini, Gian Luca Menchini, Pier Francesco Boschi

    "PROJECTThe “Caltanissetta” Tunnel is part of the ANAS S.p.A (National Autonomous Roads Corporation) $ 1.3 Billion Highway 640 Caltanissetta-Agrigento (Sicily, Italy) Rehabilitation Project, consistin

    Jan 1, 2016

  • SME
    A Resource Evaluation Study Of The Los Bronces Breccia-Porphyry Copper-Molybdenum Sulfide Deposit, Chile

    By L. R. Stoiser

    The mineral resource potential of the Los Bronces deposit was successfully evaluated by an intense, coordinated program over a 37-month period (April 1978-May 1981) as part of an economic feasibility

    Jan 1, 1982

  • SME
    Computer Use In The Mining Industry

    By B. L. Gibbs

    The mining industry is constantly in a state of flux -boom or bust; mine openings and closings. Part of the reason is the nature of ore deposits -they are there or they are not. Once they are mined, t

    Jan 1, 1993

  • SME
    Hedges Gold Pty. Ltd. Tailings Disposal Dam Design, Performance, Operating Philosophy and Rehabilitation Plans

    By Malcolm Wills

    Hedges Gold Pty. Ltd. mines and processes a lateritic gold orebody approximately 120 km south east of Perth in the Darling plateau. The operation is approximately 26 km from the town of Boddington a

    Jan 1, 1992

  • SME
    Building High Performance Teams And Enhancing Cash Flow

    By W. M. Hart

    Business Process Improvement (“BPI”) Change to Survive “It is not the strongest of species that survive, nor the most intelligent, but the one most responsive to change.” [Charles Darwin]

    Jan 1, 2006

  • SME
    Industrial Mineral Sustainability Opportunity

    By F. G. Heivilin

    There will be 3 billion people moving into cities by 2050. Permitting is both the biggest obstacle and the biggest opportunity for mining. The problem is not if we have the right minerals, but how we

    Feb 27, 2013

  • SME
    Coal 1985

    By C. Heath

    US coal consumption reached new heights in 1985, but production was constrained by excess consumer inventories. Domestic consumption of coal reached a record 742 Mt (818 million st) during the year. T

    Jan 5, 1986

  • SME
    Diversity Of Utility Scrub-Switch Decisions

    By J. Platt

    Recent EPRI research on utilities? likely strategies to reduce sulfur emissions differs sharply from policy analyses showing all- switching or all-scrubbing choices. Energy Ventures Analysis, with Ste

    Jan 1, 1987

  • SME
    Hard Rock Pressure Tunnel Final Lining Design Guide Summary - NAT2022

    By Wern-ping N. Chen

    Pressure tunnel includes water-supply tunnels and tunnels for hydroelectrical power plants. Their design principles are different from those of water/wastewater/conveyance and transportation tunnels.

    Dec 1, 2022

  • SME
    Bureau Contribution To Slope Angle Research At The Kimbley Pit, Ely, Nevada

    By Robert H. Merrill

    In 1960, the Kennecott Copper Corp. and the U.S. Bureau of Mines entered into a joint research program to determine the changes in stress, strain, and displacement created by changes in slope angles.

    Jan 1, 1968

  • SME
    The Risks in Fundamentals of Recoverable Resource Models

    By M. E. Rossi, J. A. Bassan, J. B. Novillo

    Sampling and geological models are the basis of recoverable resources models. They are pillars of mineral resources and reserves estimation, and what geostatistical methods for grade estimation should

    Jan 1, 2019