Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High-Arsenic Bearing Concentrates Processed in the Teniente Converter at Codelco Norte Smelter

    By C. Caballero, K. Itagaki, P. Morales, A. Moyano, J. Font

    Codelco-Chile is considering different processing options for the new projected concentrate from the Alejandro Hales mine. This concentrate is featured by its high arsenic content of up to 6%. Thus, i

    Jan 1, 2007

  • CIM
    Dynamic Biomechanical Simulation for Identifying Risk Factors for Work-Related Musculoskeletal Disorders During Construction Tasks

    By J. Seo

    We propose a dynamic biomechanical simulation method that uses motion capture to evaluate the risk of Work-related Musculoskeletal Disorders (WMSDs). Statistics show that WMSDs accounted for 33% of al

    Aug 1, 2013

  • CIM
    Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit Simulation

    By M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin

    This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data

    Jan 1, 2011

  • CIM
    Laboratory simulation of a closed-circuit grind for a heterogeneous ore

    By J. A. Finch

    Samples of feed and product from a closed grinding circuit treating a heterogeneous lead-zinc ore were taken. The feed was subjected to laboratory batch grinding in a rod and ball mill with the object

    Jan 1, 1979

  • CIM
    Characterization of the 75% Gd0.8Sr0.2Co03_6 / 25% Ce0.9Gd0.102-8 composite cathode system for use in intermediate temperature solid oxide fuel cells

    By L. B. Kilius

    The composite cathode system based on Ce0.9Gdo.1O2_,5 electrolyte with a painted cathode was used for an intermediate temperature (500-700°C) solid oxide fuel cell. This cathode system was chosen due

    Jan 1, 2005

  • CIM
    Separation of Nickel and Cobalt from a Sulfuric Liquor with Synergistic Solvent Extraction

    By M. M. C Jiménez, D. C. Buzzi, D. C. R. Espinosa, J. A. S Ténorio, G. F. R Oliveira

    In this work the extractive and selective capacities of solvent extraction synergistic systems to recover nickel and cobalt were evaluated. The liquor used was from the high pressure acid leaching pro

    Jan 1, 2014

  • CIM
    Development of an Innovative Hydrostatic Shaft Liner Design for a New Shaft in Saskatchewan?s Athabasca Basin

    By J. Ouellet

    The authors participated in a study for a new mine shaft in Saskatchewan?s Athabasca Basin where ground freezing is desired to reduce water inflows. Constraints were imposed on the design in terms of

    Jun 1, 2012

  • CIM
    Loads on Friction Props on a Longwall Face

    By H Zorychta

    Based on underground measurements made at the Nova Scotia coal mines of the Dominion Coal Company, Limited, this paper presents a comparison between the physical properties of hardwood packs and steel

    Jan 1, 1965

  • CIM
    Strength, Deformation and Thermal Parameters of Rocks Heated to High Temperatures

    By Piotr Malkowski

    Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi

    Aug 1, 2013

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    Rix Athabasca Mine

    By Franc R. Joubin, Donald H. James

    "The Property of Rix Athabasca Uranium Mines Limited is in the Beaverlodge area of northwestern Saskatchewan. The mine is 7 miles by road north from the Lake Athabasca port of Bushell which is 250 mil

    Jan 1, 1949

  • CIM
    New Developments in the INPUT Airborne E. M. System

    By P. G. Lazenby

    This paper describes the latest instrumentation improvements in the INPUT Airborne E.M. System, particularly the new electronic signal-processing techniques. Several anomaly examples illustrating thes

    Jan 1, 1973

  • CIM
    Analyzing Building Information Using Graph Theory

    By S. Isaac

    The networks of interdependencies between elements in building projects, referred to as the project topology, are often complex and difficult for project teams to comprehend. It is hypothesized that a

    Aug 1, 2013

  • CIM
    New Solutions in the Area of Belt Conveyor Elements Increasing Energy Efficiency of Mine Transportation Systems

    This paper presents the results of research aimed at proposing new solutions in the area of belt conveyor elements. Many factors, such as energy consumption costs, and operating costs of belt conveyor

    Aug 1, 2013

  • CIM
    Structure of the Ferderber gold deposit, Belmoral Mines Ltd., Val d'Or, Quebec

    By L. Vu, V. Popov, J. Beland, R. Darling

    "The Ferderber gold deposit is of Archean age. It consists of a series of gold-bearing quartz lenses within a shear zone that crosscuts the central part of the quartz dioritic Bourlamaque batholith. O

    Jan 1, 1987

  • CIM
    The Engineering Department of the Hudson Bay Mining and Smelting Company, Limited

    By J. A. Haskin

    The Engineering Department at Flin Flon has the following responsibilities: 1. Underground Surveying. 2. Open-Pit Surveying and Supervision of Blasting. 3. Mine Geology and Examination of Prospects

    Jan 1, 1935

  • CIM
    The Journey from Compliance-Based Safety to Safety; A way of Life

    By Richard Wells

    Peabody Energy is the largest pure-play publicly traded coal company in the world. We have been in business 129 years and like most of the coal mining companies in the United States, since 1969 the ma

    Aug 1, 2013

  • CIM
    Recent Smelting Practice at Noranda

    By W. B. Boggs

    A paper describing the Noranda smelter was presented at the 1930 annual meeting of the Institute (1). A lacer article appeared in the Trans-actions of the A.I.M.&M.E. in 1933. Since that time there ha

    Jan 1, 1939

  • CIM
    Upgrading The JK SAG Mill Model

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Methods to Reduce the Environmental Hazards of Mining and Processing of Minerals in the Arctic Regions

    By P. V. Amosov, V. A. Masloboev, D. V. Makarov, S. G. Seleznev, A. A. Baklanov

    "The development of industry and intensive use of natural resources leads to a significant decrease in the share of reserves of rich ores, deposits of which have nearly all been exploited. Large amoun

    Jan 1, 2016