Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel IntersectionsBy Hocking G
For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D
Jan 1, 1976
-
Process Implications of Ferrolysis in Hyper-Saline WaterBy J Bean
Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo
Oct 5, 2011
-
Sustainable Development and the Minerals Sector ù Leaving a Lasting LegacyBy L Chaffey, M Buckland
The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil
Jan 1, 2006
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
Interactions between Flash Flotation and Gravity Concentration – An Industrial Case Study of a Refractory Gold ConcentratorBy D Semini, B Newcombe
Base-metal sulfide refractory gold ores often contain a portion of ‘free’ gold that is amenable to recovery using gravity concentration methods, whilst the refractory portion of the gold is better rec
Sep 1, 2014
-
Tailings process optimisation through automation and controls integrationBy R Williams, M Baxter, D Zink, R Cunningham
The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi
Jul 23, 2018
-
Recovery-by-size Kinetic Analysis to Determine Where Metallurgical Improvements Occur When Converting to High-chrome Grinding MediaBy C J. Greet, S Jacques
In most instances, the application of high-chrome grinding media results in an increase in the recovery of the valuable mineral(s). The authors have published data from a number of plant-based case st
Sep 1, 2014
-
Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metalsBy J H. Park, R R. Kim, H S. Park, H J. Kim
This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce
Jun 19, 2024
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
Geometallurgical Modelling of the Dumont DepositBy M Sciortino, J Korczak, J Muinonen, A St-Jean
The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir
Sep 29, 2013
-
State-of-the-art of electroslag refining and challenges in the control of ingot cleannessBy G Stovpchenko, G Jianjun, L Medovar
Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti
Jun 19, 2024
-
Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)By Medhurst TP, Trueman R, Hutchinson IN
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed
Jan 1, 1992
-
Further Development of Short-face Technology in the Soviet Coal MinesBy Kuzmitch O, Morozov A
The main direction in the mechanisation in the mines of the Donbas and the USSR is long-face technology with complexes on the base of hydraulic supports. On the base of the 30 year old experience of e
Jan 1, 1991
-
Independent Decline Haulage at Kanowna Belle Gold MinesIn May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w
Jan 1, 2002
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
Making a positive change – evolving the modern Integrated Remote Operations Centre (IROC) to optimise and support carbon-neutral value chainsBy G McCullough, J Els, J Bassan
Integrated Remote Operations Centres (IROCs) have a crucial role in optimising a mine’s carbon emissions, especially as industry faces an imperative to achieve net-zero emissions on an accelerated tim
Sep 18, 2023
-
Comparison of One Stage and Two Stage Classification ù A Case StudyBy M N. Mian
The Cayeli volcanogenic massive sulphide deposit is located in Black Sea region of Turkey. Cayeli Bakir Isletmeleri (CBI) was formed as a joint venture between Inmet (Canada) and Eti Holding (Turkey).
Jan 1, 2003
-
Theory of Sampling meets the National Science Foundation I-Corps™ programBy V Rodríguez, M Hormaza, R J. Romañach, C Pinzón-de la Rosa
The authors have presented their ideas for developing a powder sampling device in the I-Corps™ program sponsored by the National Science Foundation (NSF). This is an intensive customer discovery progr
May 9, 2017
-
Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald RiverBy J Player, R de Vries, J F. Carswell, R Hassell
"The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development
Oct 16, 2017
-
SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantificationBy J Ashford, Minniakhmetov
Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir
Mar 22, 2022