    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    A Novel Approach to Estimate the Gap Between theáMiddle- and Short-Term Plans

    By J Ortiz

    In almost all copper mining companies, mine planning is done considering different time frames, leading to long-term (life-of-mine) (LOM), medium-term (first three years) and short-term (first year, m

    Sep 26, 2011

  • AUSIMM
    PIMS ù The Road to Efficient, Cost-Effective Plant Operation

    By D Hunter

    A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i

    Jan 1, 2003

  • AUSIMM
    Application of sensor-based-sorting technology at pilot plants in South America

    By T Soares, P Esteves, C Senna, V Souto, E Dias

    Steinert provides a wide portfolio of Sensor Based Sorting (SBS) technologies, including the possibility to combine different sensor data in the development of the separation applications. This multi

    Nov 10, 2020

  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Value of information – blasthole assay tool spacing analysis using geostatistical simulations

    By I Minniakhmetov, J Ashford

    Orebodies constitute naturally occurring, commonly highly variable concentrations of minerals in the earth’s crust formed through varying and highly unpredictable processes. Orebody knowledge is a cor

    Mar 22, 2022

  • AUSIMM
    Tunnelling Projects in Singapore

    By A J. Burchell

    The introduction reviews the tunnelling carried out in Singapore since the early 1980s. Between 1983 and 1990, Phases 1 and 2 of the mass rapid transit system were constructed. These included some 20

    Jan 1, 1999

  • AUSIMM
    Red mud to green iron – proposed pathway for iron elution via bioleaching of bauxite residue

    By A Tolley

    Bauxite residue or ‘red mud’ is a by-product of the Bayer Process, the primary process of alumina refining. Due to its high alkalinity and variable composition, its storage and disposal poses high env

    Sep 18, 2023

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Grade control and deleterious materials in polymetallic deposits

    By R J. Goldie

    The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During

    Mar 22, 2022

  • AUSIMM
    Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar Region

    By A B. Jahed, Ö Aydan, T Ito

    In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc

    Nov 29, 2022

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Project Hobson – New Technology in Auckland

    By T Ireland

    The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug

    Mar 8, 2011

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin

    By A L. de Ambrosis, F M. Weir, M Fowler

    Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass

    Sep 17, 2014