Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Challenges facing non-ferrous metal production

    By P Taskinen, D Lindberg

    The increase in metals demand in the electrifying globe means significant growth in the smelting of copper, nickel, zinc, and lead, produced from primary sulfide sources or using sulfide mattes as the

    Aug 21, 2024

  • AUSIMM
    Ventilation Challenges Facing the Metalliferous Sector

    By D J. Brake

    The underground metalliferous mining industry continues to change under the influence of many factors including, to name a few, new mining techniques and equipment, new approaches to risk management,

    Jul 1, 2013

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • AUSIMM
    Ore Genesis in Fracture-Controlled Hydrothermal Systems: Percolation Theory Approaches

    By M A. Knackstedt

    Coupling between deformation processes and rock permeability is a major factor influencing the architecture of fluid migration and the localisation of ore deposition in several types of hydrothermal o

    Jan 1, 1999

  • AUSIMM
    Au-Ag Recovery from Complex Ore by Flotation

    Au-Ag Recovery from Complex Ore by Flotation

    Sep 13, 2010

  • AUSIMM
    The Industrial Synergy Between Mineral Sands and Saline Waters of the Murray Basin, Australia

    By G Sparrow

    The Murray Basin is being heralded as the next major mineral sands province in Australia. Already exploration programs have delineated extensive commercial deposits and several companies are progressi

    Jan 1, 2001

  • AUSIMM
    Economic Sustainable Power for Mineral Processing

    Economic Sustainable Power for Mineral Processing

    Sep 13, 2010

  • AUSIMM
    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Sep 13, 2010

  • AUSIMM
    Determination of the Crystalline Percentage in a Natural Silica Material with Respect to the Emission of Respirable Silica Dust

    By A Asadov, D Nair

    This paper discusses the determination of the percentage of crystalline material in a natural silica deposit which would be considered harmful to health (<10 ¦m). A sample of the natural silica mat

    Jan 1, 2003

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Sep 13, 2010

  • AUSIMM
    Leading Practice Water Management at Moranbah North Underground Mine

    By D Yates, C C(te, M Rodgerson

    This paper describes how specific technical and regulatory issues related to water management have been dealt with at Anglo AmericanÆs Moranbah North mine. It compiles the collection of practices that

    Nov 26, 2013

  • AUSIMM
    Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, Queensland

    By J Robinson, D Herbert

    Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat

    Jan 1, 1998

  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    Sintering technologies of sinter mixtures containing high proportions of magnetite concentrates

    By H Han, L Lu

    Due to the international depletion of reserves of traditional high-grade iron ore, the ore resources available throughout the world, especially in steel mills in East Asia, have changed drastically fr

    Jul 24, 2017

  • AUSIMM
    Spatial Modelling and Optimisation of Geometallurgical Indices

    By M J. Newton

    As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri

    Sep 5, 2011

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: 1 Mt Non-Notified Consent

    By R J. Mills, B S. Sinclair, D A. Fergusson, A G. Goldstone

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • AUSIMM
    Geotechnical Applications of Geophysics in Coal Mining

    In coal mining, geophysical techniques have an established application in determining the location of seam boundaries ahead of the face so that underground mines can be planned to avoid any geological

    Jan 1, 2002

  • AUSIMM
    A Team Approach to Optimising a Mining Method - Bench Stoping in the Silver/Lead/Zinc Orebodies at Mount Isa

    By Jarc H

    The steeply dipping silver/lead/zinc orebodies at Mount Isa mine have been extracted most recently by a combination of cut-and-fill and open stoping methods. Bench stoping was first used at Mount Isa

    Jan 1, 1992