Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Thermodynamic Work Principal Overture — Not Just Rock n’Roll
By Michael Wieland
The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant
Jan 1, 2009
-
Electronic Tools for Borehole Inspection
By Michael Olmsted
Inspection of boreholes prior to blasting can result in cost reductions as well as increases in efficiency and safety. Until recently, borehole inspection was performed in two manners. For simple insp
Jan 1, 2000
-
Paper or Electronic Records – Ways to Improve Blast Documentation and Recordkeeping
By Travis A. Davidson, Ralph E. Burnham, Cathy Aimone-Martin, J. Kelly Ratliff
Blasters face a long list of tasks to execute daily—from vehicle inspections to blast design and layout, hole loading and tie-in, securing the site, and finally, safely executing the blast. Good pract
Jan 21, 2025
-
Applying up-to-date Blasting Technology and Mine to Mill Concept in Quarries
By Robert McClure, Frederic Leclercq, Ricardo Chavez
With significant vibration control and fragmentation challenges facing them, the CBS quarry (department of the Nord) successfully integrated a technical partner and mine to mill optimisation to deal w
Jan 1, 2007
-
Monitoring of Dynamic Borehole Pressures
By B. Papilon
Dynamic pressures during blasting can affect performances of both electronic and non-electronic detonators. Boreholes can develop tremendous amount of pressures during blasting. The effect of such ele
Jan 1, 2013
-
Close-In Blasting at the Tri-Met Light Rail Tunnels in Portland, Oregon
By Don Z. Painter, Gordon F. Revey
Frontier/Traylor Joint Venture is presently constructing a section of the Tri-County Metropolitan Transit District of Oregon's (TRI-MET) Westside Light Rail system. This new section will extend Portla
Jan 1, 1995
-
Report on the 11th International Symposium on Rock Fragmentation by Blasting
By A T. Spathis
The 11th International Symposium on Rock Fragmentation by Blasting (FRAGBLAST 11) was held in Sydney, Australia, between 24-26 August, 2015. The 93 papers, including six keynote presentations, covered
Jan 1, 2015
-
"Sanfo": The "Missing Link" in Explosives Technology
By R J. Johnson
The development of "SANFO" has provided the Mining Industry with a LOW COST HIGH GAS VOLUME, VARIABLE DENSITY, Blasting Agent which can be blended "On Site" in a simple Agitator mixing and charging sy
Jan 1, 1996
-
Response of Manufactured Houses to Blast Vibrations
By Michael Mann
Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl
Jan 1, 2000
-
Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process
By John Vynne
Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter
Jan 1, 2000
-
Portable, Multi-Channel and Continuous Velocity of Detonation Recorders
By Jackson R. Pressley, Bruce Vandenberg
An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.
Jan 1, 1997
-
Trench Blasting in Close Proximity to Existing Utilities in Ultra Metamorphic Rock (705d7ae2-b943-4f91-9b2f-b06e02816eba)
By Tom Treleaven, Andrew Williams
Several contracts were let in Greenwich, Connecticut, for the installation of a sanitary sewer. The majority of the excavation was in rock and involved numerous challenges due to the following condit
Jan 1, 2003
-
Concepts and Case Study for Regular Rhythmic Timing and Sequence
By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks
"Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw
Jan 1, 2016
-
Application of New Technologies for PSD Data Acquisition
By J. Pizarro
Any organization that subjects its activities to a continuous improvement methodology, aiming to optimize their processes and services, must be able to adequately measure the results of the implemente
Jan 1, 2024
-
Experimental and Computational Investigation of the Fundamental Mechanisms of Cratering (c03a8e57-961a-42b6-9348-3dd891fa944e)
By B Brown, P J. Hommert, B J. Thorne
"Early attempts at estimation of stress wave damage in blasting by use of finite element analysis met with limited success due to numerical instabilities that prevented calculations from being carried
Jan 1, 1990
-
Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast
By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor
A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis
Feb 6, 2023
-
Top Hammer Drilling-The Way Things Work
By William D. Hissem
For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.
Jan 1, 1998
-
Economics of Blasting around Steep Dipping Coal Seams at the Mt. Owen Mine
By Trevor Howie, Mal Edwards
"Thiess Contractors Pty Ltd. designed and operate the Mt Owen Mine in the Hunter Valley of NewSouth Wales, Australia on behalf of the owners of the mine, BHP Coal Pty Ltd. The mine is a multiseam open
Jan 1, 1997
-
The Impacts of Digital Revolution in the Mining Sector. Case of Study: Blasting Operations of a Copper Mine in the Northern of Brazil
By Vitor Fonseca de Barcelos, Jair Carlos Koppe
Our society is experiencing a digital revolution. Technology is demonstrating its significant potential for mining industry. In this paper are presented the measured and estimated impacts of applying
Feb 1, 2020
-
"Suppression of Dust Generation during Blast Demolition of ConcreteColumns"
By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho
Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal
Jan 1, 2016