Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck Bridge

    By Timothy C. Siegel, Paul J. Axtell

    The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.

    Jan 1, 2017

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • DFI
    Acceptance Of Timber Piles Based On Equivalent Driving Energy

    By Chu E. Ho

    This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final

  • DFI
    John F. Kennedy Airport Site Redevelopment: Tapertube Pile Foundation

    By Gisele R. Passalacqua, Aly Mohammad, Joanna Smith

    The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased

  • DFI
    Wolf Creek Dam Foundation Remediation – An Innovative Solution

    By Fabio Santillan, Lyndon Bedford

    "This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra

    Jan 1, 2015

  • DFI
    Ground Improvement By Controlled Modulus Columns - A San Pedro Case Study

    By Sunil S. Basarkar, Vinothkumar S

    Ground Improvement Techniques serves to improve various engineering properties for supporting various foundations. These may be undertaken either by conventional or advanced methods. The Controlled Mo

    Sep 1, 2022

  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022

  • DFI
    Restoration Of Railway Embankment – A Case Study

    By Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee

    One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a

    Sep 1, 2022

  • DFI
    Analysis of Soil and Structural Thermal Response of a Field Scale Geothermal Energy Pile

    By Mohammed Faizal, Abdelmalek Bouazza

    "The operation of ground source heat pumps combined with foundation piles can have an effect on the thermal behaviour of the pile and the surrounding soil. This paper presents the effects of continuou

    Jan 1, 1900

  • DFI
    Ground Improvement for Reclaimed Landfills

    By Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse

    "Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie

    Jan 1, 2017

  • DFI
    Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation

    By Michael Arnold

    "BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d

    Jan 1, 2015

  • DFI
    Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit Project

    By Jeongbok Seo

    The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m

    Jan 1, 2010

  • DFI
    An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & Construction

    By Abid O. Adekunte

    The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing

    Jan 1, 2008

  • DFI
    Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage Structures

    By Ramanathan C, Prasad P. V. S. R

    The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph

    Sep 1, 2022

  • DFI
    The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling

    By Frank J. Purcell

    “Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou

    Nov 1, 2022

  • DFI
    Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam

    By Mario Mauro

    Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-

    Jan 1, 2008

  • DFI
    Strength and Deformations of Piles Supporting Transient Pipe Anchors in Heavy Industrial Pipelines

    By Konstantin G. Ashkinadze

    The paper considers performance of piles supporting transient pipe anchors in heavy industrial pipelines. Events such as pump trips or opening and closing of large valves produce short-term dynamic pu

    Jan 1, 2016

  • DFI
    Seismic Remediation of Perris Dam

    By Michael W. Driller, Wen Yan (Grace) Chen, Steven J. Friesen

    "Remediation for Perris Dam has been proposed in response to deficiencies identified in a seismic stability study prepared by the California Department of Water Resources (DWR) in 2005. Lenses of pote

    Jan 1, 2015

  • DFI
    Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CA

    By Eric Lindquist, John Compagnone, Gabriel Carvajal

    "Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq

    Jan 1, 2017