Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results

    By Walter I. Paniagua

    Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a

    Jan 1, 2007

  • DFI
  • DFI
    Framework for Risk-Based Electric System Deep Foundation Design

    By Steve Davidow, Ashely E. Evans, Peter M. Kandaris

    "Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation

    Jan 1, 2017

  • DFI
    Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits

    By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto

    "Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained

    Jan 1, 2014

  • DFI
  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • DFI
    Information Construction Technology For Supported Excavation In Urban Construction

    By Sun Jiale

    This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application

    Jan 1, 1991

  • DFI
    Geotechnical Design and Performance of Road and Railway Viaducts Supported on DSM Columns - A Summary of Practice

    By Michal Topolnicki

    "Discussed is the use of wet Deep Soil Mixing, generally executed with single mixing tools 0.8 to 1.6m in diameter, employed in the foundation of viaduct supports. The applications involve economical

    Jan 1, 2015

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • DFI
    Risk Management Techniques to Avoid Litigation

    By Kevin Cunningham

    "Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.

    Jan 1, 2015

  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations

    By Tracy Brettmann

    The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b

    May 1, 2022

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004

  • DFI
    Recent Advances In Quiet & Vibration-Less Steel Pile Installation & Extraction

    By Ray. K. Filip

    The concept of installing a steel sheet pile retaining wall into the ground by "pressing" has resulted in the development of various equipment solutions over the last thirty years e.g. Taylor Woodrow

    Jan 1, 2006

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000