Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Round Hill Gold-Scheelite Deposit, Macraes Flat, Otago, New Zealand
The Round Hill gold-scheelite deposit is located three kilometres from Macraes Flat and approximately 60 kilometres due north of Dunedin, New Zealand. A mining feasibility study is currently being und
Jan 1, 1987
-
Closure Planning Lessons Learnt from the Century Mine
By J Crosbie, M Lord, R Bitencourt, P Defferrard
The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans
Jun 22, 2016
-
The Importance of Mineral Processing Technology for Establishing a Sustainable Society with an Environmentally-Sound Material Cycle
For establishing sustainable material cycle process in human system, a brand new concept should be created, which could recycle the waste materials, which are land-filled and discarded under present e
Sep 13, 2010
-
Variation in property parameters of iron ore granulated mix with moisture content
By C Li, D O’Dea, R Moreno-Atanasio, T Honeyands
The behaviour of iron ore granules in the feeding process of sintering is significantly influenced by the material properties of the granulated mix. Therefore, the measurement of key material properti
Jul 24, 2017
-
Performance of Electrodes Containing Brown Coal Char in Alumina Reduction (76ee41ec-7c9b-4d9b-9404-4c3cd7756bf3)
A predicted increase in aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electr
Jan 1, 1971
-
The Geology and Mineralisation of the Ladolam Gold Deposit, Lihir Island, Papua New Guinea
By Ware AR, Doyle BJ, Hoogvliet H
The Ladolam deposit lies within the altered volcanic rocks of the caldera floor, part of which now forms Luise Harbour. It was discovered in 1982 in the course of a reconnaissance drainage sedimen
Jan 1, 1991
-
The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited
The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine
Jan 1, 1968
-
The Mining Industry and The National Economy of Australia
Your Excellency, on behalf of the Council of the Australasian Institute of Mining and Metallurgy, and, indeed, on behalf of everyone present, I extend to you a welcome, and our thanks for your graciou
Jan 1, 1944
-
Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW
By Secis R
Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&
Jan 1, 1997
-
Fault Swarms in the Greta Coal Seam, New South Wales
By Burns K. L
Keyboard patterns of hundreds of minor faults with vertical displacements of 3 mm to 2 m occur within the Greta coal seam and cause serious mining problems in collieries. Many of the faults are concen
Jan 1, 1978
-
Removing Overburden at Golden Ridges Mine, New Guinea
The Golden Ridges Mine, one of the properties of New Guinea Goldfields Limited, is situated on the right bank of Nami Creek, not far from the township of Wau, in the Territory of New Guinea.The proper
Jan 1, 1934
-
The Removal of Zinc from Lead Slag by Sulfation and Chlorination
By G C. Bolton
Experiments were conducted to access the feasibility of removing zinc from lead slag by sulfation or chlorination or both. Gaseous sulfation with sulfur dioxide and oxygen released only 50 per cent of
Jan 1, 1980
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
By A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
A Progressive, Iterative Approach Leading to Reliable Metallurgical Accounting Sampling Systems
By F F. Pitard
The optimization of metallurgical processes requires knowledge of the heterogeneity carried by constituents of interest. The common scenario, almost an industry standard, is to rely on the engineering
Sep 7, 2015
-
Science Technology and the Mineral Industry Mines and Universities û A Vital Link
Engineering education has become a matter of national concern, at last, so I would like to talk about the links between the mining industry, the universities and technological developments. The Austra
Jan 1, 1989
-
Transition from owner mining to contract mining – a structured tender process using a holistic approach
By Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
Concentration Practice in the Australian Beach Sand Industry
Beaches contain the residue of eroded rocks which have resisted weathering, and it is common to find in all beaches some of the harder, heavy minerals. The natural sorting action of waves and winds te
Jan 1, 1950
-
Designing and Operating Backfill Systems on a South African Gold Mine
For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,
Jan 1, 1998
-
Presidential Address, 1954
Delivered at the University of Sydney, on June 4th, 1954.THE TORCH WE HOLDLast year Our Institute celebrated its Diamond Jubilee, coincident with the holding of the Fifth Empire Mining and Metallurigc
Jan 1, 1954
-
Production Drill and Blast Practices at Ridgeway Gold Mine
Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram
Jan 1, 2002