Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Low Density Explosives - A Product that Requires Some Rule Changes

    The basic make-up of the majority of currently produced bulk explosives has changed little in the last 20 years. These explosives would be described as mature in a life cycle analysis. Therefore these

    Jan 1, 2007

  • AUSIMM
    Mass Mining using Room and Pillar Methods at Estonia Oil Shale Mine

    The Estonia Mine, operated by Eesti Energia Kaevandused AS (EEK), the mining division of the Estonian Government's energy company, Eesti Energia AS, is a large room and pillar mine located in Eas

    Dec 6, 2010

  • AUSIMM
    Surface and Underground Magnetic Investigations in the Southern Coalfields of New South Wales

    Magnetic anomalies in the Southern Coalfields have been subdivided into two characteristic types. Each type is attributed to a separate cause, one being basement structure, and the other near-surface

    Jan 1, 1967

  • AUSIMM
    Penetration Speed References for the Drillability of Rocks

    From time to time efforts have been made to classify rocks according to their hardness, toughness and abrasiveness, and to use these classifications to provide an indication of the ease or difficulty

    Jan 1, 1950

  • AUSIMM
    Mining Operational Effectiveness ù An Argyle Diamond Mine Case Study 2002

    Operational effectiveness is fundamental to any operation, becoming highly topical in those experiencing less than optimal output from their fleets. It is all encompassing aiming to identify those fac

    Jan 1, 2003

  • AUSIMM
    The Role of Conditioning Energy in Emulsion Flotation (99b0a156-5b49-41d8-9443-41bbbc826543)

    The effect of conditioning energy input on the metallurgical results of an emulsion flotation process has beenattributed by previous authors to a detergency process.This paper shows that such a proces

    Jan 1, 1970

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand

    Platinum-group minerals (PGM) are recorded from a number of localities along theWaiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts of

    Jan 1, 1995

  • AUSIMM
    Loy Yang Power, GHD ù A Case Study in Alliancing

    By P Wood

    Loy Yang Power (LYP) owns and operates a 2160 MW brown coal fired, base load power station in the Latrobe Valley, Victoria, Australia (Loy Yang A). It also owns and operates a brown coal mine that sup

    Jan 1, 2006

  • AUSIMM
    Evolution of Cenozoic Oil- and Gas-Bearing Sedimentary Basins of Active Continental Margins: Northeastern Asia and Bering Sea

    The sedimentary basins of this region developed in the collision zone of thePacific Ocean plate and the continent. Stresses were transmitted thorough wedge-like lithospheric blocks, such as the Okotsk

    Jan 1, 1995

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming

    By M Aros, L Reilly

    Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal

    Nov 24, 2014

  • AUSIMM
    Impact of Mining on the Lower Ngakawau River

    By M Pizey, M Kingsbury

    Since 1950 Stockton Open Cast Mine has excavated over 60 million tonnes of Brunner Coal Measures overburden sandstones and mudstones. The current operator, Solid Energy New Zealand, recognises that ac

    Jan 1, 2003

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965