Search Documents

  • CIM
    Challenges & Improvements in Milling at Omai Gold Mines

    By Gregg Vickell

    "High tonnage, low grade gold mines such as Omai’s afford economies of scale that are unto their own insufficient to sustain profitability at today’s depressed gold price. Complimenting profitability

    Jan 1, 1999

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • NIOSH
    OFR-93-84 Survey Of Electrostatic Hazards Detection And Minimization

    By R. W. Courtney

    The objective of this study is to make a critical evaluation of the magnitude and extent of electrostatic hazards in typical U.S. mining operations and to assess the adequacy of techniques, materials,

    Jan 1, 1982

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • NIOSH
    RI 5637 Use Of Membrane Filters For Determining The Size Of Dust Agglomerates As They Actually Exist In A Gas Stream ? Summary And Conclusions

    By L. J. Kane

    Conventional methods for determining the size of dust suspended in a gas require that agglomerates (clusters of particles) first be broken into particles, but in evaluating industrial dust-removing eq

    Jan 1, 1960

  • ISEE
    Probable Causes of Explosives System Malfunction in Blasting

    By B Mohanty, G Yamin

    A number of parameters, aside from blast design and pre-existing rock conditions, can change the performance of the explosives system in actual blasting practice. Sympathetic pressures caused by deton

    Jan 1, 2005

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • CIM
    Applications of Engineering Analysis to Improve Tire Management

    By Jie Zhou

    Mining mobile equipment is becoming larger in order to lower operation cost and increase productivity; however, their performance characteristics are often limited by the tire capabilities. Although c

    May 1, 2006

  • AUSIMM
    Some Experiments on Water Jet Cutting and Consideration of Its Use as a Drilling Tool in Rocks

    An account is given of experimental apparatus for generating a short duration high velocity water jet and the effect of its impingement on various rock samples under air or water cover. The penetratio

    Jan 1, 1969

  • SME
    Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144

    By N. Paas

    Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati

    Feb 24, 1997

  • AUSIMM
    Ore Localization by Preconsolidation Structures

    Some major mineral deposits in northern Australia are found in preconsolidation slump disturbances in the sediments.In the retransported marine sediments at Tennant Creek, breccia beds and disturbance

    Jan 1, 1960

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • SAIMM
    Practices And Design For Extending The Hearth Life In The Mittal Steel Company Blast Furnaces

    By W. Carter, P. Chaubal, K. Spaleck, M. Schoeman, J. Bobek, W. Seegers

    Keywords: Pyrometallurgy, steel, hearth, blast furnace The Mittal Steel Company operates about 36 blast furnaces on four continents. Furnaces range from 1100 m3 to 4800 m3 inner volume. The focu

    Jan 1, 2006

  • AUSIMM
    A Relational Data Base and Data Management System for the Onshore Gippsland Basin

    By Gaulton R

    The Commission maintains a data base first computerised in 1957 and containing information from over 18 000 boreholes located mainly in the Latrobe Valley area. Some of the borehole derived informat

    Jan 1, 1992

  • SAIMM
    In Situ Stresses In Mining Areas In South Africa

    The safety of mining operations is significantly influenced by the in situ stress fields in which the mining excavations are created. From the point of view of planning of mining operations, the in si

    Jan 1, 1998

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • SME
    Comparison of Face Pressurized Shield Methods in Various Soil Conditions

    By Klaus Rieker

    Over the last 30 years Wayss & Freytag Ingenieurbau AG has gained a lot of experience in mechanized tunnelling on various major projects. During this period most important developments concerning the

    Jan 1, 2005

  • AUSIMM
    Alluvial Gold and Gold Mobility in Quartz Gravels, Waimumu, Southland

    Detailed characteristics of gold from Pliocene auriferous quartz gravels from Waimumu (Southland) have been studied using a combination of optical microscopy, energy dispersive microprobe analysis and

    Jan 1, 1987

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012