The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, UtBy P. J. Bethell
Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod
Jan 1, 2008
-
Nanobubble Column Flotation For More Efficient Coal RecoveryBy A. Sobhy
Froth flotation is a widely used, cost effective coal cleaning process. However, its high process efficiency is limited to a narrow particle size range between approximately 50 to 600 µm for coal and
Feb 27, 2013
-
Application Of Background Oriented Schlieren (BOS) For The Qualitative Analysis Of Flow Through A RegulatorThe schlieren technique describes an optical analysis method designed to enhance light distortions caused by air movement. The ability to visualize air flow has significant implications for analyzing
Jan 1, 2011
-
Political-Risk Management in the Northern Andean CountriesBy W. J. Spat
Political risk is an integral part of the mining business in northern Andean countries. Peru, Ecuador, Colombia and Venezuela all have a higher than average political risk compared with other South A
Jan 1, 2000
-
How To Develop An Optimum Metallurgical Project (322b7426-21ae-4055-bbba-e346381936a6)By R. W. Smith, D. L. Taylor, K. A. Altman
The importance of metallurgical information in reaching appropriate decisions during the development of mining projects is demonstrated. A financial analysis is calculated using a simulation that inc
Jan 1, 2000
-
Crisis Management: What To Do If Disaster StrikesBy Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich
The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later
Jan 1, 2004
-
Anticipated Behavior Of Silty Sands In TunnelingBy Ronald E. Heuer, Debra L. Virgens
INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,
Jan 1, 1987
-
Mine Seismicity and The Comprehensive Nuclear-Test-Ban TreatyMany mining operations generate seismic signals. They come from blasting and from underground mine failures such as rockbursts, longwall first caves, coal bumps and pillar collapses. Traditionally,
Jan 1, 2000
-
Emplacement And Mineralization Of The San Cristobal Ag-Zn-Pb Deposit, Southern BoliviaBy S. E. Phillipson
The Late Miocene San Cristobal Ag-Zn-Pb deposit represents syngenetic and epigenetic mineralization with low- and high-sulfidation characteristics. Geology is characterized by barren dacitic ring fra
Jan 1, 2001
-
Heap Leach Gold Production ModelingBy M. Irish, M. Jahraus
Accurate prediction of gold (or other metal) production from a heap leach operation is essential to the economic vitality of any such operation. However, this is also one of the most challenging issu
Jan 1, 2001
-
Application Of Lightweight Beds For Haul Trucks At Lone Tree Mine (Doing More With Less)By T. Mills, M. Evatz
Newmont’s Lone Tree Mine, located in northern Nevada, is an open pit gold operation supported by a standard truck and shovel mine production fleet (Caterpillar 785Bs and Hitachi EXs). Newmont continu
Jan 1, 2001
-
Enabling Mining Safety & Automation By Electronically Scanning Microwave Radar Systems On Surface Mining MachinesUsing a series-model of an automotive short range radar sensor (SRR) and a recently completed experimental radar system, field tests have been performed in a surface mine. It was examined, to what ext
Jan 1, 2007
-
New Polymeric Dispersants For Industrial MineralsBy T. J. Lynch
A new class of polymeric dispersants for industrial minerals has been synthesized and evaluated. Currently available dispersants give initial low viscosities at high mineral loadings, however slurry
Jan 1, 2012
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation MonitoringA series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Drainage Ph, Acid Production, And Acid Neutralization For Archean Greenstone RockBy K. A. Lapakko, D. A. Antonson
Fourteen samples of pyrite-bearing Archean greenstone rock (d < 6.35 mm, 0.04% < St < 1.22%) were characterized (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing.
Jan 1, 2002
-
Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based ApproachBy Bülent Erdem, Zekeriya Duran, Tuğba Doğan
The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface
Jun 16, 2022
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station ProjectBy James McNally, Adam Stremcha, John MacGregor
With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i
Jan 1, 2007
-
NATM Through Clean Sands—The Michigan Street ExperienceBy Mohamed A. Younis, Paul J. Headland, Paul H. Madsen, Vojtech Gall
INTRODUCTION A 100 ft long, 20 ft high and 18 ft wide NATM tunnel was excavated through grouted clean sands beneath a busy city street, including a variety of existing utility lines. The new tunnel
Jan 1, 2007
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002