Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of The Pacheco Pumping Chamber And ShaftsBy Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021By P. Nelson, R. O’Connell, J. Rostami
Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u
Jun 13, 2021
-
Tunnel Cost ModelBy Charles H. Minott, Michael J. Markow, Robert D. Wyatt, Fred Moavenzadeh
The substantial investment in tunnels anticipated in the next twenty years has focused new attention on the economics of tunnel construction itself and on some costly problems associated with undergro
Jan 1, 1974
-
Analysis And Modeling Of Longwall Face-To-Face TransfersBy C. Patrick
Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer
Jan 1, 1993
-
Open Pit Geometry Modeling And Economic Analysis Of Novel At-Face-Slurry OptionsThe evolution of surface mine layout configuration is a function of the schedules and sequence of material excavation within the optimized layouts. The production schedules and sequence of materials m
Jan 1, 2011
-
Numerical Simulation Of Yield Pillar Behavior With Creep Material Model (e3731e33-0b34-4fad-9202-9242771c3a27)By C. Sun
In this study, numerical simulations of yield pillars employing the finite element method with time-dependent Drucker-Prager material model are conducted. The stress control mechanism of yield pillars
Jan 1, 1999
-
Mechanized Rock Excavation In MiningBy George H. K. Schenck
In this decade of the 1.970's it is forecast that eight billion cubic yards of rock will be excavated from 400, 000 miles of new tunnels, drifts and other underground workings in the western worl
Jan 1, 1974
-
Transfer of German environmental expertise for mine site rehabilitation challenges worldwide - A case study: VietnamBy R. Barthel, O. Nitzsche, J. Pateiro Fernández, T. Cramer
The Hong Gai coal field in northeast Vietnam has been the main coal mining area of Vietnam for more than 150 years. Anthracite coal is produced from several open pit and underground mines situated clo
Jan 1, 2011
-
Precambrian History Of The Rocky Mountain RegionBy Kent C. Condie
Precambrian terranes in the Rocky Mountain region decrease progressively in age from the Archean Wyoming Province (> 2.5 b.y.) to the late Proterozoic in West Texas (figs. 1,2). Within the Wyoming Pro
Jan 1, 2013
-
Seismic Design Of Underground StructuresBy A. J. Hendron, J. E. Monsees
INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr
Jan 1, 1985
-
Recovery Of Value-Added Products From Red Mud (159ea712-0a88-432f-8569-a6e0e2ae6cf7)By B. Mishra, A. Staley, D. Kirkpatrick
The major waste product of the alkaline extraction of alumina from bauxite [Bayer Process] is known as red-mud. Approximately, a ton of red-mud is produced for every two tons of bauxite mined. The red
Jan 1, 2001
-
Employment opportunities in the coal industryBy T. R. Jr. McMillan
Introduction Examining the short- and long-term job prospects for engineers in the coal industry might include looking at coal tonnage projections, future export markets, federal regulations, and the
Jan 2, 1985
-
Signifcant developments in dry rare-earth magnetic separationBy M. Dobbins
The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980s began a new era of dry magnetic separation. The RER units quickly became the separator of choice withi
Jan 1, 2010
-
Effect of micro-bubbling on settling behavior of fine particles for deep-sea miningBy Rei Arai, Yuta Yamamoto, Tetsuo Yamazaki, Naoki Nakatani
"Methane hydrate is of interest as an alternative energy resource in Japan and the R&D program has been ongoing for ten years (MH21: http://www.mh21japan.gr.jp/english/). Rare-earth element-rich deep-
Sep 1, 2014
-
Using Metal-Tolerant Plants to Reclaim Mining WastesBy David R. Morrey
During the past 50 years, significant research has been performed in the ecology and physiology of plants that colonize soils containing elevated concentrations of heavy metals. Similar work has also
Jan 1, 1995
-
Investigation of the Rockburst Mechanism of Driving Roadways in Close-Distance Coal Seam Mining Using Numerical - Mining, Metallurgy & Exploration (2021) Modeling MethodBy Stanisław Prusek, CHONG WEI, Huawei Xu, Jun Wang, Andrzej Walentek, Artur Dyczko, Derek B. Apel
The excavation-induced stresses transferred from the panels or pillars in upper coal seams play a key role in the occurrence of rockbursts in driving roadways during close-distance coal seam mining, w
Aug 26, 2021
-
Utilizing Paste Technology For Reclamation Of The Ute-Ulay Upper Tailings Impoundments, Lake City, CO - Project BackgroundBy T. Tafi
The Ute-Ulay project area is located approximately five miles west of Lake City, in Hinsdale County, Colorado. The Ute-Ulay Mine site is approximately one mile east of the project area. The elevatio
Jan 1, 2011
-
Industrial Minerals 1987By L Baumgardner, A. V. Castelli
Barite In 1987, United States mine production of barite increased 15.870, consumption (sold or used by grinding plants) increased by 6.97, and imports are estimated to have fallen by 19.57. World
Jan 6, 1988
-
A Discussion On TBM Cutter Change Time And Cutter LifeBy E. Farrokh
Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock
Feb 27, 2013
-
Rock Load Estimation For Tunnels In Squeezing Ground ConditionsBy Bhawani Singh, A. K. Dube, B. Singh
At least three hydroelectric tunnels constructed during the last decade through the lower Himalayan region in India have met with serious problems of supporting in squeezing ground conditions. Steel r
Jan 1, 1981