Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improving Quarry Production Rates by Reducing Bucket Fill Time

    By Elliott Giles

    "Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini

    Jan 1, 2016

  • ISEE
    Journal: 100 Years / du Pont Magazine E.I. du Pont de Nemours Powder Company

    By DuPont Magazine

    RBH Note: as stated many times in these articles, frozen dynamite was one of the greatest hazards facing the blaster. It wasn’t until the late 1920s that it was solved for good, with the introduction

    Jan 1, 2015

  • ISEE
    Coyote Blasting - An Overview

    By S. S. Jenkins Jr.

    While the method is seldom used anymore, coyote blasting is an historically interesting way to blast large quantities of rock. It was used extensively in the days before modern fast drills were availa

    Jan 1, 2005

  • ISEE
    Characteristics of Seismic Waves Produced by Surface Mining Operations

    By Tom Goforth, Rongmao Zhou

    The interest of seismologists in mining explosions has increased substantially with the construction of the International Monitoring System (IMS). The IMS supports the Comprehensive Nuclear Test-Ban T

    Jan 1, 2006

  • ISEE
    Rock Drilling Safety - Bench Top Cleaning Versus Blasted Rock Debris Drilling

    By Amund Bruland, Vegard Olsen

    This paper presents analytical assessments around unintended misfire detonation, within rock debris drilling and bench top cleaning, primarily in the quarrying and mining industry. The main purpose of

    Jan 1, 2008

  • ISEE
    "Fast Rock Segmentation Using Artificial Intelligence to Approach Human-LevelAccuracy"

    By Ian Bell, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Mahdi Ramezani

    "Image-based rock fragmentation sensing in mining and quarry applications includes an important rock boundary delineation step, which is commonly referred to as rock segmentation. This paper presents

    Jan 1, 2017

  • ISEE
    Table Of Contents 2020 General Proceedings

    By NA NA

    Copyright © 2020 International Society of Explosives Engineers

    Feb 1, 2020

  • ISEE
    Large Scale Measurement of Velocity of Detonation

    By Alastair Torrance, Braden T. Lusk, MinGi Seo, Gary Cavanough

    Velocity of Detonation (VOD) is the most commonly used method to determine explosive performance as VOD is a function of the confinement (ground conditions) density and composition of the explosive. T

    Jan 1, 2019

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Journal: Safety Talk / Standard Operating Procedures

    By Wm. Reisz

    There is no universal standard for Standard Operating Procedures (SOP’s). Every blasting operation has its own unique circumstances, its own methodologies and its own unique demands. It would be nearl

    Jan 1, 2010

  • ISEE
    EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries

    By Matthew Clay, Colin Chambers, Susan Hookham

    Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed

    Jan 1, 2017

  • ISEE
    Increasing El Toro Mining Productivity through the Application of Massive Blasting Techniques while Reducing Environmental Impact on Neighboring Communities

    By César Ugaz Castañeda, Paulo Fernández Alvarado, Richard Sotomayor Oblitas, Rocke Enríquez

    Mina El toro has been making substantial changes in its operation to improve its social impact and productivity. Because of the use of gasified emulsions and electronic initiation system, it was possi

    Feb 1, 2020

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Analytical Measurements in Cast Blasting to Identify the Cause and Cure for "Orange Smoke" Formation

    By Charles R. Barnhart

    The Nitrogen Dioxide Cloud: After one year of testing it can be stated that we do know and understand a great deal about why the nitrogen dioxide formation is exacerbated in cast blasting. Picture 1 i

    Jan 1, 2004

  • ISEE
    Rock Removal Techniques and Equipment in Trench Excavation and Pipeline Construction. A Comparison

    By Benedict C. Di Duca

    In the underground construction industry. when bidding work, not only is the contractor faced with determining if rock: is in existence within the parameters of his work. he must also estimate the qua

    Jan 1, 1990

  • ISEE
    Dynamic Response of Buried Oil Pipeline Caused by Tunneling Blasting

    By Zheng Shuangying

    The vibration effect of the buried oil pipeline caused by tunneling blasting affects the pipeline safe transportation, tunnel construction schedule and its construction cost. The dynamic response char

    Jan 1, 2015

  • ISEE
    Performance and Detonation Characteristics of BCHMX in three different plastic matrices

    By Svatopluk Zeman, Zbynek Akstein, Jiri Pachman, Ahmed Elbeih, Marcela Jungova

    BCHMX (cis-1,3,4,6-tetranitro-octahydroimidazo-[4,5-d]imidazole or Bicyclo-HMX) was studied as an energetic component of three different plastic explosives based on three matrices: C4 matrix, semtex10

    Jan 1, 2011

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023