Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures
By Mike Cammack, Logan Huppert, Gustavo Azpilcueta
During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin
Jan 1, 2018
-
High Performance Ground Penetration Radar Project at Los Alamos National Laboratory
By R F. Hoeberling
"The use of ground penetrating radar (GPR) for geological purposes has been underway for almost two decades. The commercial need for a versatile GPR that can rapidly identify buried objects andundergr
Jan 1, 1994
-
The Effect of Fragmentation on Loader Productivity (95e8fe1a-7252-44f9-b557-30f0369d4449)
By Michael D. McGill, Jeff Freadrich
There are many factors which affect the productivity of a front end loader. One of the most obvious is the characteristics of the material being mined. Characteristics such as size distribution, swell
Jan 1, 1994
-
Stratablasttm - A New Mining Method
By T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method
By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada
The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac
Jan 1, 1996
-
Saving Time and Money with Mobile Reporting and Online Databases
By Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall
As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori
Jan 1, 2018
-
"Journal: Evaluating and Managing Blasting Risk Part II"
By Gordon Revey
The challenge of managing blasting risk, types of risk, public perception, and a system for managing risk were covered in the first part of this article in the May/June 2000 issue of the Journal of Ex
Jan 1, 2001
-
Optimization of Blast Fragmentation at Kisladag Gold Mine
By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor
This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade
Jan 1, 2015
-
Blasting Mitigation Measures Used to Control a Highwall Failure Risk
By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon
Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The
-
Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk
By Enver Alan
This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the
-
Masterblaster Blasting Management System
By Chris Uys, Johan Labuschagne
Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th
Jan 1, 1997
-
Improving Geologic Knowledge with IOT Sensors on Blasthole Drills
By Steven Putt
Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen
-
Deformation of An Explosively Driven Flat Metallic Flyer During Projection
By Seokbin Lim
In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an
Jan 1, 2010
-
Tunnel Excavation on the Abutment of an Existing Dam
To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint
Jan 1, 2016
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines
By Reinhold Schnell, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e.,metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the over
-
Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions
By Dale Preece, Steven Sobolik, Richard Jensen
Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public
Jan 1, 2000
-
CEE BEE ZERO TWO Construction to Destruction - A Case Study
By Deepak Vidyarthi
This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav
Jan 1, 2008
-
Platform Loading from Explosions in Saturated Sand using a Visco-Plastic Model
By W G. Szymczak, Leslie C. Taylor
The University of Maryland (UMD) has conducted a series of small-scale tests using explosive charges buried in saturated sand. Twelve different combinations of depth of burial of the charge and height
Jan 1, 2007
-
The Development of Methods for Minimizing the Overbreak in Tunnel Blasting
By Dong-Hyun Kim Kim, Tai-Ro Lee, Young-Hwa Seo
Overbreak occurred inevitably in a tunnel excavation, is the main factor for increasing cost and period in tunnel projects. Furthermore the damage to the remaining rock mass related to the overbreak c
Jan 1, 2003
-
Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization
By Sushil Bhandari, Amit Bhandari
Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field
Jan 1, 2019