Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Installation Of Augered Cast-In-Place Piles - Equipment
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Value Engineering – Design Risk and Reward at Major Sport Arena Projects
By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Building Response To Construction Activities
By Marco D. Boscardin
Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have
Jan 1, 2003
-
Static Uplift and Lateral Load Testing of Piles for a New Power Plant
By José L. M. Clemente, John R. Davie
"Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi
Jan 1, 2014
-
Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes
By Mathew Avery, Colby Barrett
In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou
Jan 1, 2018
-
Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
Estimating N Value from Data in Press-In Piling
By Yukihiro Ishihara, Nanase Ogawa, Ming Lei
"Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro
Jan 1, 2014
-
Deep Foundations on Buildings using Driven Ductile Iron Micropiles.
By Antonio A. Cristóvão, Alexandre Pinto
"Abstract Deep foundations of buildings using driven ductile iron micropiles TRIM solutions, leads to recognized advantages, from technical, schedule and economic points of view. High production rate
Jan 1, 2014
-
Secant Pile Walls - Design, Construction And Case History
By Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles
By Franklin M. Grynkewicz
The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d
Jan 1, 1991
-
Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts
By Harry Schnabel
A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi
Jan 1, 2011
-
Seismic Considerations for Bridge Foundations
By Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples
By J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989
-
"Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."
By Alexander J. Verstraeten
Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de
Jan 1, 1987
-
Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications
By William S. Heckman
a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and
Jan 1, 1997
-
Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California
By Lawrence P. Goldfarb
This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg
Jan 1, 1993
-
Interface Testing For The Design Of Micropiles In Expansive Soils
By Robert W. Schaut
The use of micropiles is increasing for new construction and to retrofit distressed foundations in expansive soils. Typical micropiles in expansive soils have a lower section where the micropile grou
Jan 1, 2011
-
A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in Turkey
By Arash Maghsoudloo, Asli Can
"Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi
Jan 1, 2014
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City
By Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles
By George Piscsalko
There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me
Jan 1, 2011